Laserfiche WebLink
9. DTSC Involvement in the Remedial Action: <br /> A. Did DTSC order the Remedial Action? <br /> Yes _ No X (Remedial Action completed under VCA) <br /> Date of order: <br /> B. Did DTSC/EPA review and approve: (Check appropriate action and <br /> indicate date of review/approval if done.) <br /> X Sampling Analysis Procedures Date: The Remedial Design and <br /> Implementation Plan was <br /> approved on March 12, 2004. <br /> X Health & Safety Protections Date: Same as above <br /> X Removal/Disposal Procedures Date: Same as above <br /> X Removal Action Plan Date: The Final Remedial Action <br /> Plan was approved on <br /> August 30, 2001. <br /> C. If site was abated by a responsible party, did DTSC receive a signed <br /> statement from a licensed professional on all Remedial Action? <br /> Yes X No_ Dates (from) December 2003 through April 2004. <br /> D. Did a registered engineer or geologist verify that acceptable engineering <br /> practices were implemented? <br /> Yes X No_ Name: David G. Dixon, P.G., (Professional <br /> Geologist) <br /> Date of verification: August 11, 2005 (Remediation Completion Report <br /> date) <br /> E. Did DTSC confirm completion of all Remedial Action? <br /> Yes X No_ Date of verification: November 15, 2005 (DTSC <br /> Approval of Remediation Completion <br /> Report) <br /> 4 <br />