My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
0
>
2900 - Site Mitigation Program
>
PR0515453
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 4:41:49 PM
Creation date
12/11/2019 4:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515453
PE
2950
FACILITY_ID
FA0012156
FACILITY_NAME
NORTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
FREMONT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1readwell&Rolb <br /> Mr. Jeff Wong <br /> 12 December 2000 <br /> Page 3 <br /> • If high concentrations of TPH as motor oil are detected in shallow soil, then two samples <br /> will be analyzed for polychlorinated biphenyls (PCBs) by EPA Method 8082. <br /> • Two grab groundwater samples will be analyzed for TPH as gasoline, diesel, mineral <br /> spirits and motor oil by EPA Method 8015M, and volatile organic compounds including <br /> MTBE by EPA Method 8260. <br /> Waste Disposal <br /> Soil generated during the soil boring activities, and water generated during decontamination <br /> procedures will be drummed, labeled, and disposed of once the chemical analyses results are <br /> known. <br /> REPORTING <br /> The report will summarize the current and historic site uses, describe the field investigation and <br /> include boring logs, and soil and groundwater sampling results. <br /> Please call with any questions regarding the proposed investigation. <br /> Sincerely yours, <br /> TREADWELL & ROLLO, INC. <br /> David G. Dixon, R.G. Philip G. Smith <br /> Senior Project Manager Principal <br /> 25970401.MSR <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.