Laserfiche WebLink
1�dmfd1&R 10 <br /> Jeffery Wong <br /> San Joaquin County Environmental Division <br /> 22 December 2003 <br /> Page 4 <br /> All soil, groundwater and decontamination water generated during this scope of work will be <br /> stored on site in drums pending analytical results. All borings will be closed by pressure <br /> grouting in accordance with San Joaquin County requirements. <br /> SCHEDULE <br /> Above ground demolition(down to building foundations) is scheduled to begin during the third <br /> or fourth week of January 2004. We would like to proceed with the site investigation prior to 15 <br /> January 2003. If you have any questions regarding this workplan please call. <br /> Sincerely yours, <br /> TREADWELL&ROLLO, INC. <br /> SRED G,4 <br /> G. <br /> a� ay -' <br /> 2� * No, 7066 <br /> David G. Dixon,IeG r Philip G. Smith, REA 11, CPGS <br /> Senior Project Manager `rye Principal <br /> ` OFOp;:` :/ <br /> 25971003.DGD <br /> Attachments: Boring Permit Application <br /> Figure 1 —Site Plan <br /> cc: Lorraine Islas; City of Stockton Mayor's Office <br /> Kitty Walker, Stockton Housing and Redevelopment Department <br />