Laserfiche WebLink
E <br /> MW-7 EXPLANATION <br /> + Approximate location of proposed boring <br /> WEST FREMONT STREET MW-3 - Approximate location of monitoring well <br /> VEW2® Approximate location of vapor extraction well <br /> ----------- Outline of former buildings <br /> - - Parcel boundary <br /> ---♦ Ozone Sparging System <br /> MW-5* <br /> MW-8 <br /> i <br /> American Protective <br /> Services building <br /> Farmer dispensing <br /> MW-4 island <br /> VEW31AS3 <br /> VEW21AS2 ® VEW11AS1 ' MW-3* <br /> Area 21 Storm drain Storm drain— MW-11 ' <br /> I ------ 0 20 Feet <br /> i Former underground t 1 <br /> 1 ---fuel tank --- . Approximate scale <br /> /L------...-------------� <br /> 3 Excavation boundary LU <br /> � w � <br /> MW-6 cFn MW-2 <br /> of NORTH SHORE <br /> STOCKTON HOUSING <br /> o m AND REDEVELOPMENT DEPARTMENT <br /> ZZ <br /> aStockton,California <br /> Cl AREA 21 -PROPOSED BORING LOCATION <br /> Crystal Creamery 404 W. FREMONT <br /> o Warehouse (CRYSTAL CREAMERY) <br /> QI Date 12/22/03 Project No. 2597.10 Figure 1 <br /> O <br /> 0 Reference: 6asemap from Siegfried Engineering,Inc.,199q. <br /> Tr�advr�181l0 <br />