Laserfiche WebLink
N <br /> Steve Jerkins Page 2 <br /> Feasibility studies can proceed concurrently with the soil and groundwater investigation phase to obtain <br /> site specific data to determine the effectiveness of various remedial technology alternatives in <br /> removing the contamination at this site. The feasibility study will be incorporated into a Corrective <br /> Action Plan (CAP ) , in addition to an analysis of the extent of contamination. The CAP will select the <br /> most cost effective remedial technology . <br /> For the Crystal site to remain in compliance with the California Code of Regulations (CCR) Article 11 , <br /> PHS/EHD requires a workplan for investigation of the remaining contaminated soil from the 1986 UST <br /> removal and an interim remediation plan to prevent further off site migration of the plume be submitted <br /> by April 30, 1996. <br /> For further information please call Steve Sasson at (209) 468-3459. <br /> Donna Heran , RENS, Director <br /> Environmental Health Division Diiviisiion <br /> Ste eon Senior REHS Margaret La ono, REHS <br /> 9 Lag <br /> ono <br /> Mitigation Unit Lead Senior <br /> SS <br /> cc: Wallace Kuhl, Kurt Balasek <br /> Elizabeth Thayer, CVRWQCB <br /> Anabelle Mackey , SWRCB <br />