My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 9:22:01 AM
Creation date
12/12/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MW- 1 has had free product since it was first sampled April 8 , 1992 . The amount of free product <br /> has always been small , approximately one quarter of an inch or just a sheen. There isno active <br /> or passive free product removal occurring for the free product in this well. Although the amount <br /> j of free product is small the presence of free product has been consistent for almost three years . <br /> Since the amount of free product has not abated by natural degradation, PHS/EHD now requires <br /> that some method of free product removal be initiated to reduce the load of contamination which <br /> is contributing to degradation of the groundwater in this location. <br /> In a letter dated November 9 , 1994 PHS/EHD requested a remediation workplan or an <br /> investigation to determine the remaining mass balance of contamination which was left in the soil <br /> subsequent to the tank removal which occurred on September 9, 1986 . At this time there is no <br /> such workplan proposed . <br /> For the Crystal site to remain in compliance with CCR Article 11 a soil <br /> I <br /> nvestigation/remediation workplan for the remaining contaminated soil from the 1986 tank <br /> removal and a free product removal system for MW- 1 shall be submitted to PHS/EHD by March <br /> 5 , 1995 . Initiation of work on site shall begin by April 5 , 1995 . <br /> For further information please call Steve Sasson at (209) 468-3459 . <br /> Donna Heran, REHS , Director <br /> Environmental Health Division <br /> I <br /> Steven Sasson, Senior RENS Diane M. mson, REHS <br /> Site Mitigation Unit Supervisor <br /> SS <br /> CC : Wallace Kuhl <br /> Elizabeth Thayer, RWQCB <br /> Barbara Anderson, SWRCB <br /> William Chase <br /> Robert Chase <br /> Bill McKlinty- Roger Foote and Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.