My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 9:22:01 AM
Creation date
12/12/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> omorand um <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD • CENTRAL VALLEY REGION <br /> 3443 Routier Road Phone : ( 916) 361 - 5600 <br /> Sacramento, CA 95827- 3098 ATSS : 8-495- 5600 <br /> TO : Antonia K . J . Vorster FROM : Gary Reents <br /> Senior Engineer Project Engineer <br /> DATE : 3 July 1987 SIGNATURE : <br /> SUBJECT: UNDERGROUND TANK CONTAMINATION WORK PLAN , CRYSTAL REAM AND BUTTER , <br /> SAN JOAQUIN COUNTY <br /> The subject work plan , dated 22 April 1987 , was submitted to the San Joaquin <br /> Local Health District by Applied Geosystems , consultants to Crystal Creamery and <br /> Butter Company ( Crystal ) . The work plan was prepared based on the results of <br /> previous work detailed in letter reports of 10 October and 17 November 1986 , and <br /> 23 January 1987 . <br /> To date , Crystal has removed the leaking underground tank , excavated contamina- <br /> ted soils , and installed one ground water monitoring well . Contaminated soils <br /> east of the excavation and south beneath a warehouse , remain in place . Samples <br /> from the monitoring well contained volatile aromatic constituents above State <br /> Action Levels . The 22 April work plan proposes to install and operate a soil <br /> venting ( vapor extraction ) system to mitigate soil contamination , conduct a soil <br /> gas study to define the plume , and pump the existing monitoring well to mitigate <br /> ground water contamination . <br /> At this time the primary objective at the site is to define the extent of soil <br /> and ground water contamination . Once the contamination extent is determined , <br /> complete mitigation measures can be implemented . The proposed soil vapor and <br /> ground water extraction measures may be appropriate as interim remedial <br /> measures , but their effectiveness as final mitigation actions cannot be <br /> determined . Mitigation measures cannot be designed or compared until the extent <br /> and degree of contamination is determined . <br /> Accordingly , the primary object of the site investigation should be to : <br /> i . Define the areal extent of soil contamination . <br /> 2 . Define the horizontal and vertical extent of ground water contamination . <br /> 3 . Design and implement measures to mitigate impacts from the site . <br /> Based on the actions proposed in the 22 April work plan , Crystal could meet <br /> these objectives by : <br /> i . Performing a soil gas survey to define the extent of soil <br /> contamination and qualitatively estimate the horizontal extent of <br /> ground water contamination . <br />
The URL can be used to link to this page
Your browser does not support the video tag.