Laserfiche WebLink
The shallow percolation test for Parcel 3 failed. The deep <br /> percolation rate for Parcel 3 was 15 minutes per inch. A <br /> combination of leach lines and pits are recommended. <br /> A 10 ' soil profile was performed on Parcel 2 and a 19 ' soil <br /> profile was performed on Parcel 3 . Water was not encountered <br /> in either profile . The results are shown on the field note <br /> sheets . <br /> Engineers Statement <br /> Septic systems can be installed to the density proposed and <br /> it is not expected to impact groundwater nor cause other <br /> health hazards . <br /> Dwain C. Tosch <br /> Attachments : <br /> Detail Map <br /> Percolation Field Note Sheets ( 3 ) <br />