My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
517
>
2900 - Site Mitigation Program
>
PR0541344
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:09:53 PM
Creation date
12/13/2019 11:01:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541344
PE
2960
FACILITY_ID
FA0023692
FACILITY_NAME
GUARDINO & CRAWFORD
STREET_NUMBER
517
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13721410
CURRENT_STATUS
01
SITE_LOCATION
517 W FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Guardino-Crawford Co. -2- July 7, 1999 <br /> corrective action process into phases. In addition, Article 11 requires the responsible parry to submit an <br /> investigative workplan/Corrective Action Plan (CAP) before performing any work. This phasing <br /> process and the workplan/CAP requirements were intended to: <br /> 1 . .help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3 . ensure the Fund will only reimburse the most cost-effective corrective action alternative requited by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> fne environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1) notifying the regulatory agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard. Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation: of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preannroval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing, you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions, please contact me at (916) 227-4411 . <br /> Sincerely, <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EIID <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> California Environmental Protection Agency <br /> co Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.