My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
517
>
2900 - Site Mitigation Program
>
PR0541344
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 12:30:38 PM
Creation date
12/13/2019 11:05:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541344
PE
2960
FACILITY_ID
FA0023692
FACILITY_NAME
GUARDINO & CRAWFORD
STREET_NUMBER
517
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13721410
CURRENT_STATUS
01
SITE_LOCATION
517 W FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 August 2004 <br /> AGE-NC Project No . 95-0167 <br /> Page 4 of 9 <br /> Laboratory reports for the soil analyses, testing methods, laboratory QA/QC reports, and sample <br /> chain of custody documentation will be presented in a report with findings and recommendations. <br /> 2.4. WELL COMPLETION, DEVELOPMENT AND SURVEY <br /> Following drilling of each soil boring, ground water monitoring wells will be installed within the <br /> borehole. Following well installation, each well will be developed to maximize water flow and <br /> minimize the amount of fine-grained sediment drawn into the well during pumping or bailing. Each <br /> well will also be surveyedby a state licensed surveyor. Procedures for well installation, development <br /> and surveying are presented in Sections 3 .4. and 3 . 5 . . <br /> 2.5 , GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> Ground water monitoring and sampling of each newly installed ground water monitoring well will <br /> be conducted on a quarterly basis (in conjunction with the six existing monitoring wells) unless an <br /> alternate schedule or suspension of monitoring is approved by the EHD. Ground water monitoring <br /> activities will include recording depth to groundwater measurements and collection of groundwater <br /> samples. Ground water sample collection procedures are described in Section 3 .6 . 1 <br /> Groundwater samples will be analyzedby aDHS-certified laboratory for the following constituents: <br /> • TPH-g and TPH-d in accordance with EPA Method 8015 Modified; and <br /> • BTEX and the fuel additives DIPE, ETBE, MTBE, TAME, TBA, 1 ,2-DCA, EDB in <br /> accordance with EPA Method 8260B. <br /> Laboratory reports for the ground water analyses, testing methods, laboratory QA/QC reports, and <br /> sample chain-of-custody documentation will be presented in a report with findings and <br /> recommendations. <br /> 2. 6 . REPORT PREPARATION <br /> Following the CPT boring advancement, monitoring well installation, sample collection and <br /> analysis, a report will be prepared presenting the findings. The report will include a description of <br /> work performed, results of the ground water and soil sampling and analysis, conclusions and <br /> recommendations. The report will be in a format acceptable to RWQCB guidelines, and will be <br /> reviewed and signed by a California Registered Geologist. <br /> .Advanced GeoEnvironmental, Inc. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.