Laserfiche WebLink
1 27 July 2000 <br /> AGE-NC Project No 95-0167 <br /> Page 4of4 <br />' • The next quarterly monitoring event should be scheduled for September 2000 On <br /> completion of one-year of monitoring the ground water monitoring well network, closure <br /> cnteria for the site should be determined if warranted by the data <br />' • Additional wells be installed in the southeast corner and east of the site for plume definition <br /> 60 LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> limited number of available data points (i e ground water and soil samples), and subsurface <br /> conditions may vary away from these data points No other warranty, expressed or implied, is made <br />' as to the professional recommendations contained in this report <br /> 1 • <br /> i <br /> 1 <br /> 1 <br />