Laserfiche WebLink
RECEIVED <br /> Monitoring System Certification SEP 17 2018 <br /> UST Monitoring Site Plan ENVIRONMENTAL <br /> Site Address: Pacific Service Station 6131 PACIFIC AVENUE STOCKTON CA 95207 HEALTH DEPARTMENT <br /> Any items underground that are not visible to the <br /> . . certifying technician are a professional opinion only and <br /> are solely for informational purposes. Drawing not to <br /> . scale. <br /> . . . . . KEY *PIPING <br /> A=AMULAR Sensor (ARROWS) <br /> D O, . . . . . . . . F=FILLS Drawing of <br /> . . _ , . . . . . . . . . V=VAPOR piping exit of <br /> P=PROBE sump and UDC's. <br /> L=Turbine/Leak Detector No underground <br /> X=SUMP SENSOR drawing is <br /> B=Brine Sensor accurate,we <br /> S=Stuart Sensor cannot speculate <br /> C=Floats&Chains blue pr <br /> E=EStop <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . I . . . . I . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> C <br /> 87 . <br /> n OO <br /> . O 9I T <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . 6 L <br /> L <br /> . . . . . . . . . . . . . . . . . . . OO T <br /> . . . . . DIE O X <br /> . . X . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . CAS <br /> PACIFICAVE E <br /> Date map was drawn:8/28/18 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Cert'rfication. On your site plan, <br /> show the general layout of tanks and piping. Cleary identify locations of the following equipment,if Installed:mentioning system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />