Laserfiche WebLink
Pa;e o` <br /> SWRCB,January 2002 <br /> 6, PIPS-NG SUMT TESTING X professional Engineer <br /> Test�Method?eve!oped B�: _ E.Sump ti4anufacturer Industry Standard <br /> Omer(Specify) <br /> 0 Vacuum X Hydrostatic; <br /> Test Method Used: <br /> C Pressure <br /> Other(Specify) N <br /> Test Equipment Used:Caldwell Level Change indicator <br /> Equipinent Resolution: .002 u <br /> Surn #3 Sumo# <br /> Sump# 1 p ` F <br /> - � 48++ <br /> Sump Diameter: 48" — <br /> " <br /> 39 <br /> 39" 139" I <br /> Sump Depth: _ <br /> Fiber lass Fiberglass 1Fiberalass <br /> Sump Material: � 8 <br /> Height from Tank Top to Top of ls„ 114" 113" <br /> Hi ibest P,DinoPenetration: — `ENVIR9NMENTAL HEALT <br /> 16" 1I !5" <br /> Height from'pank Top to Lowest 14`�" <br /> Electrical Penetration: y - D ; Dry — <br /> Condition of sump prior to testing: Dry �' <br /> `6tVater Line 17" Water Line 18" Water line 17" <br /> EDoes <br /> Samp Tested' <br /> ne shat down when ' Yes , Yesd <br /> or deatects4liquid(both Yesd waxer;) �_--- -" acs Alarmed <br /> Turbine shutdown.r;sponse time ;jos:Alarmed No: Alarmed I_ --- <br /> Is system prcgru,-nmed for fail-safe : yes Yes <br /> shutdown? <br /> Was fail-safe veri ed to be No No ! No <br /> o tional?` <br /> Wait time betwesr_applying water P 5 Minutes 5 Minutes ! 5 Minutes f <br /> and startin test: ------ 10.-10 <br /> Test Start Time: 11:00 <br /> 10:05 <br /> Initial Reading(Ri): 1 ,001 <br /> .001 I .001 { <br /> Test End Time: 11:30 <br /> 10:35 ! :0:40 <br /> Final Reading(R=):- .001 :401 I .001 <br /> 30 Minutes 1 30 Minutes <br /> 30 Minutes <br /> Test Dura:on: i <br /> r- t)- 0 i <br /> Change in Readin g I'R R �--- 0 0 <br /> I! <br /> Pass/Fail Thres!io;d or Criteria: o .005/30 Minutes 1 .005130 Minutes'30 Minutes -- <br /> �. I 7. <br /> Yes <br /> W+� as sensor remoVd :'or testing? y e3 - es __-.,- <br /> U Was sensor properly replaced and Yes Yes <br /> 1'es i <br /> verified functional after testing? It <br /> Comments -- ;include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 ecify how much was tested. If the answer to ilk of the questions indicated with an <br /> If the entire depth of the sump is not tested,sp <br /> asterisk(.*)is„N1 0„o:"ti A",the entire sump must be tested. (See S'W RCB LG-160) <br /> SwKI 13,January LUU.4 <br />