My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006545
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILLIAMS
>
19523
>
2600 - Land Use Program
>
PA-0700113
>
SU0006545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 3:05:44 PM
Creation date
12/18/2019 2:46:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006545
PE
2606
FACILITY_NAME
PA-0700113
STREET_NUMBER
19523
Direction
S
STREET_NAME
WILLIAMS
STREET_TYPE
WY
City
RIPON
APN
24513038
ENTERED_DATE
4/30/2007 12:00:00 AM
SITE_LOCATION
19523 S WILLIAMS WY
RECEIVED_DATE
4/30/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond Hoo <br />COMMUNITY DEVELOPMENT <br />PA -07-113 (AE) <br />A Maintenance Agreement to ensure that Wagner Road from State Highway Route 120 to River Road <br />is maintained to a condition acceptable to San Joaquin County shall be executed by the applicant. <br />Provide a video tape showing the condition of Wagner Road from State Highway Route 120 to River <br />Road, and review the condition of this road with the Department of Public Works prior to the start of <br />excavation. <br />4. Loads on all public roads shall be required to be legal loads only. (Street and Highway Title Section <br />10-2350) <br />An encroachment permit shall be required for work within road right-of-way. <br />(Development Title Sections 9-1145.4 and 9-1145.5) <br />6. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br />the time of building permit application. The fee currently is $194.33 per trip -end in the Ripon area. <br />The amount due has been determined to be $1,165.98 based on the facility's traffic volume The fee <br />shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br />published by the Engineering News Record. (Resolutions R-90-304, R-9-1025, R-93-167, R-94-650, <br />and R-96-592) <br />MRC:BD:av <br />P:\COMMENTS\AE\PA-0700113.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.