Laserfiche WebLink
05/29/LUU'7 U3:32 FAA 209L494641 _ _ SSJID 10003 <br />3. The landowner will take such steps as are required by the S.S.J.I.D. Water <br />Superintendent to remedy any erosion on banks adjacent to the District's facilities. <br />4. 'No soil will lie stockpiled over the S.S.J.I.D. pipeline. <br />5. :No heavy equipment will travel over the S.S.J.I.D. pipeline without approved <br />'bridging, said bridging to be approved between S.S.J.I.D. and the contractor. <br />6. 'No trees and/or rubbish will be disposed of or stored on the S.S.M.D. easement or <br />facilities. <br />7. IS.S.M.D. will be notified 48 hours in advance of any excavation work. <br />8. The landowner agrees that the existing pipeline or concrete lined canal do not <br />i�resently leak and agrees that any damage will be repaired at landowner's expense. <br />I <br />9. 'It is understood by the applicant that the District shall not be held responsible to <br />remedy high water table problems created by the excavation. <br />10. :Landowner shall provide District with sufficient fill dirt from excavation for <br />protection of canal or pipeline and place fill dirt as directed by District Engineering <br />]Department. <br />11. .Any irrigation pipeline or service structure (District or Private) installation or <br />modification necessitated by the proposed excavation shall be performed at the <br />Landowner's expense. Furthermore, owner shall obtain a Construction Permit and <br />;structure Permit from the District prior to installing, modifying, or removing any <br />irrigation pipeline or structure on District facilities. <br />12. lvew casements shall be conveyed as needed to acconmmodate the relocation of <br />)District facilities and to provide needed access, if deemed necessary. <br />13. In regards to satisfying the County's Development Standard Section 9-1410.3 (b)(2) <br />which requires that the final grade shall not adversely affect the irrigability of the <br />property or surrounding properties, the District shall not assume any cost or <br />responsibility for making such determination. Owner's Engineer shall submit an <br />,analysis based on irrigation criteria provided by the District. The District will review <br />analysis and determine if it meets our criteria and approve accordingly. <br />These requirements are based upon previously approved standards that were generally considered <br />acceptable in the past and should not be construed as being all-inclusive. Each and every item is still <br />subject to review and approval or disapproval by the District's Board of Directors. Further, prior to <br />plans submittal, the owner shall submit a retainer for plan check and inspection required for the <br />project in accordance with the current fee schedule. <br />2 <br />