My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> 7. Provides ongoing review of the protection level needs as project <br /> work is performed, and informs the . PM of the need to <br /> upgrade/downgrade protection levels as appropriate; <br /> r <br /> j 8. Sees that decontamination procedures listed in Section 10.0 are <br /> �s followed by D&M personnel; <br />{ <br /> 9. Establishes monitoring of D&M personnel and records results of <br /> exposure evaluations; <br /> 10. Halting D&M site operations, if ',(necessary, in the event of an <br /> emergency or to correct unsafe work practices; and <br /> 11. Reviews and approves this project (health and safety plan. <br /> 4.3 WESTERN DIVISION HEALTH AND SAFETY MANAGER (Dames & Moore) <br /> The Western Division Health and Safety Managerl (DHSM) shall: <br /> t <br /> 1. Determine the need for periodic audits of the operation to evaluate <br /> compliance with this plan. <br /> L2. Provide health and safety support as requested by the SSO and PM. <br /> 4.4 PROJECT PERSONNEL (Dames & Moore) <br /> i <br /> Project personnel involved in onsite investigations and operations are <br /> responsible for: <br /> 1. Taking all reasonable precautions to prevent injury to themselves <br /> and to their fellow employees; and'' <br /> I <br /> r2. Performing only those tasks that they believe they can do safely, <br /> �+ and immediately reporting any accidents and/or unsafe conditions to <br /> the SSO or PM. <br /> �` II <br /> 3. Implementing the procedures set forth in the Health and Safety Plan, <br /> and reporting any deviations from ''�the procedures described in the <br /> Plan to the SSO or PM for action. I <br /> CHEVMERC.H50 8 <br /> r <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.