My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L; 5.7 HEAVY EQUIPMENT <br /> Operation of heavy equipment in drilling or other activities presents <br /> L potential physical hazards to personnel. The 'following precautions should be <br /> observed whenever heavy equipment is in use: <br /> Go Personal <br /> protective equipment (PPE) such as' steel-toed shoes, safety <br /> glasses or goggles, and hard hats should 'be worn whenever such equipment <br /> is present. <br /> o Personnel should at all times be aware of the location and operation of <br /> heavy equipment, and takerecautions to la <br /> p av oid getting in the way of its <br /> operation. Never assume that the equipment o operator sees <br /> p you; make eye <br /> contact and use hand signals to inform the operator of your intent. <br /> o Traffic safety vests are required for D&MI personnel working near mobile <br /> C heavy equipment, such as backhoes and other excavators. <br /> o Never walk directly in back of, or to the side of, heavy equipment without <br /> the operator's knowledge. <br /> o When an equipment operator must operate in tight quarters, the equipment <br /> d <br /> subcontractor should provide a person to assist in guiding the operator's <br /> movements. <br /> C � , <br /> o Keep all non-essential personnel out of the work area. <br /> o All heavy equipment that is used in the exclusion zone should remain in <br /> that zone until its task is completed. The equipment subcontractor should <br /> completely decontaminate such equipment'',) in ,the designated equipment <br /> decontamination area as required. <br /> 6 <br /> i <br /> r <br /> L � <br /> CHEVMERC.H50 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.