My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> r <br /> i C <br /> 8.0 SITE CONTROL <br /> i 8.1 GENERAL <br /> I <br /> Barricades and barricade tape should be used to delineate an exclusion zone <br /> around the work area. The barriers should be set in a 25 foot radius (as <br /> i practical) around the work area to provide sufficient maneuvering space for <br /> personnel and equipment. A short piece of barricade tape can be affixed to a <br /> secure upright or drill rig mast to serve as a wind-direction tell-tale. A five <br /> foot opening in the barricades at the support zone (upwind of the work area) will <br /> serve as the personnel and equipment entry Mid exit point. The personnel <br /> decontamination station will be established at this point if formal <br /> r decontamination procedures are required (see 9.0) . All entry to and exit from <br /> Lthe work area will be made at this opening in order to control potential sources <br /> of contamination and leave contaminated soil and debris in the work area. <br /> CAt the end of the shift all bin llng holes and excavations must be, org/sam liP I� <br /> covered or otherwise secured. All cuttings and decontamination fluids are to be <br /> handled in accordance with relevant regulations! and instructions from the PM. <br /> The PM or SSO will determine an upwind evacl'I�uation area prior to each shift, <br />� <br /> and all personnel will be notified of its location. A horn or other signalling C <br /> device will be used to signal an evacuation in the event of an emergency. Three <br /> blasts of the horn will be the signal to immediately stop work and proceed to the <br /> C evacuation area. <br /> II <br /> The SSO will see that all site visitors sign the; visitors' log and that all t <br /> Dames & Moore personnel who enter the work zohe do so only after presenting <br /> evidence of both their participation in a medical, surveillance program and <br /> completion of health and safety training programs that fulfill the requirements <br /> of this plan. I <br /> 1 <br /> The SSO will provide site hazard and emergency, action information to all <br /> site visitors before they enter the site; this !Ican be done by providing a copy { <br /> of this SSP to the visitor. <br /> �I <br /> t <br /> r CHEVMERC.H50 22 <br /> 'i <br /> r' <br /> L � <br />
The URL can be used to link to this page
Your browser does not support the video tag.