My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
3500 - Local Oversight Program
>
PR0545105
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 2:04:26 PM
Creation date
12/19/2019 2:01:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545105
PE
3528
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
02
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 3.2.3 Site Safety&Health Officer <br /> 4 The SSHO will assist the Program SHM in implementing the 'HASP-and will be responsible for <br /> the following: <br /> • Assist and represent the SHM in on-site training and the continued on-site <br /> implementation and enforcement of the HASP <br /> • Be assigned to the Site on a full-time basis for the duration of field activities <br /> • Ensure site compliance with specified safety and health requirements, OSHA <br /> regulations and all aspects of the HASP including, but not limited to, activity <br /> hazard analysis, air monitoring, use of PPE, decontamination, site control, <br /> standard operating procedures used to minimize'l hazards, safe use of engineering <br /> control,the emergency response plan, and documenting results of site inspections <br /> Assure that all personnel on-site are knowled eable with the provisions <br /> plan g p isions of this <br /> Stop work, if unacceptable safety and health co <br /> rditioris exist, and take necessary <br /> action to re-establish and maintain safe workingconditions <br /> Coordinate any necessary modifications to the HASP with the SHM and PM !! <br /> I <br /> 3.2.4 Field Personnel <br /> All field personnel assigned to the project, including subcontractor personnel will follow the j <br /> requirements of the HASP andwill be responsible for the following: <br /> • At all times acting in a responsible and cautious manner in order to prevent <br /> } accident, injury, and/or exposure to themselves or their co-workers <br /> • Reporting any and all accidents, injuries, exposures, and/or near misses to the <br /> SSHO or the PM <br /> k <br /> • Attending and participating in all tailgate safety meetings conducted during the <br /> project <br /> LI I <br /> • Following instructions and directions from the S�SHO and PM <br /> i <br /> • Utilizing the PPE provided and specified for use <br /> L <br /> • Following the field safety procedures for safe work practices, buddy system, <br /> communication, site control, decontamination, evacuations, and related <br /> emergency procedures <br /> • Performing only those tasks that they have been instructed to perform and that <br /> they believe they are trained, qualified and capable at the time of assignment } <br /> �4 <br /> sacDP-N.•ICm111dlin9WalaLShar",gjec1sI0J71778407.aa.do 3-3 <br /> 1217100 <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.