My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
3500 - Local Oversight Program
>
PR0545105
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 2:04:26 PM
Creation date
12/19/2019 2:01:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545105
PE
3528
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
02
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ensure that all field personnel including sub <br /> ' � g an y contractor personnel, assigned to <br /> the project have satisfied all requirements for training and medical surveillance <br /> i and that records of training and medical approval are available and maintained for <br /> i•• each person <br /> • Monitor overall safety performance of field personnel <br /> • Correct any work practices and/or conditions that has potential for injury and/or <br /> exposure hazards <br /> • Immediately stop operations in the event of a significant change in site conditions, <br /> an emergency or serious hazard, in order to protect personnel and the environment <br /> • <br /> Supervise� and submit required work ro ress/acci' <br /> dent history reports and air <br /> monitoring reports <br /> i <br /> Maintain all required safety and health records (i.e., CAL/OSHA 200 Logs, <br />` Accident Report, Record of Training, Safety Inspection Reports, etc.) <br /> Ensure that the scope of work and specifications are followed and met <br /> i <br /> 3.2.2 Program Safety& Health Manager(SHM) <br /> The Program SHM will provide project safety and health oversight activities. The SHM will be <br /> responsible for the following: <br /> • Oversee development and implementation of the HASP , <br /> • Sign and date the HASP prior to submittal r <br /> 4 <br /> • Be available in cases of emergency <br /> • Provide on-site consultation, as needed,to ensure the HASP is fully implemented <br /> • Coordinate modifications to the HASP with the'Site PM, Site Safety & Health <br /> Officer(SSHO), and any;subcontractors <br /> • Provide continued support for upgrading/downgrading of the level of personal <br /> protection <br /> • Be responsible for evaluating air monitoring data and recommending changes to <br /> 1 the engineering controls and work practices and personnel protective equipment <br /> (PPE) <br /> ' Review accident reports <br /> =DP-N:iComvltiPWUvaLSham"rcjrcLv PJ71778407.aa.doc 1 <br /> fifi 17/7/00 3-2 <br /> Sr.e <br />
The URL can be used to link to this page
Your browser does not support the video tag.