My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18970
>
1600 - Food Program
>
PR0505729
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:23:05 AM
Creation date
12/19/2019 2:43:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505729
PE
1624
FACILITY_ID
FA0006967
FACILITY_NAME
FOOTHILL PIZZA
STREET_NUMBER
18970
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
05130023
CURRENT_STATUS
01
SITE_LOCATION
18970 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOOT}fILL SHOPPIW <br /> CENTER <br /> Lorkeford/Ca,9523 7 <br /> O ffi C&Ad d r"k <br /> 11701 F Ketdern La*t , Lod.&CA 95242 <br /> CeW# 209-604-7306 <br /> Tuesday, March 22, 2016 <br /> To:Jeff Wong,County Health Inspector <br /> 1868 East Hazelton Ave. <br /> Stockton, Ca 95205 <br /> Re: Foothill Pizza <br /> 18970 N Hwy 88 <br /> Lockeford 95237 <br /> As I mentioned on the telephone this morning, we have resolved all the issues mentioned in your <br /> overall inspection notes and comments March 3rd. The only major issue that remains is the <br /> flooring as we discussed the other day. <br /> This floor was redone approximately 8 years ago at a significate cost however the material we <br /> used was apparently not the right type of material and is coming apart as we see noted in your <br /> report. As we do not feel that repair is a possibility we are looking at alternative solutions as <br /> mentioned to you the other day. <br /> We have 2 quotes which I am attaching to this letter for your review and I believe that you would <br /> be okay with either one of them. However, personally I would like to look at one more option or <br /> possibility that I observed the other day in another food preparation area. <br /> The timing for the installation will be longer than what I had anticipated as both of these <br /> installers have work schedules that are more than 3 to 4 weeks in advance. <br /> It has also been agreed with Gamal that we would have to shut down her operation for at least <br /> one week in order to complete the work. <br /> Please call me if you see any problem with the way in which we plan to correct that flooring <br /> situation. <br /> g <br /> egman, <br /> Partner of Foothill Shopping Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.