Laserfiche WebLink
P4 U'N <br /> COUNTY OF SAN JOAQUIN THOMAS R. FLINN <br /> A DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O. BOX 1810- 1810 E.HAZELTON AVENUE <br /> cf �P ,STOCKTONCALIFORNIA 95201 <br /> 4ciFoa� THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> December 18, 2000 <br /> MEMORANDUM DEC 2 02000 <br /> TO: Kerry Sullivan, Deputy DirectorCnmmu <br /> Community Development Department <br /> '�l ��'�L'�() <br /> CONTACT PERSON: Jim Van Buren <br /> -143d Ecap Al c_x <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: UP-00-23 A USE PERMIT APPLICATION FOR EXPANSION OF AN EXISTING <br /> CHURCH FACILITY TO ADD APPROXIMATELY 4,773 SQUARE FEET <br /> AUDITORIUM AND AN ENTRY WAY, LOCATED ON THE EAST SIDE OF <br /> WOODBRIDGE ROAD,APPROXIMATELY 400 FEET FROM DEL RIO DRIVE. <br /> (DISTRICT 4). <br /> APPLICANT: First Missionary Baptist Church APN: 015-210-54 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> Woodbridge Road has an existing right-of-way width of 80 feet and a planned right-of-way width of <br /> 84 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. Additional Traffic Impact Mitigation Fee may be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is $157.45 per <br /> additional trip-end in the Lodi area. The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650, and R-96-592) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066)that this development <br /> has addressed the items on the attached Waste Plan Format for Development Projects. Final Site <br /> Plan is required upon submittal of verification. <br /> GK:BN:gn <br /> PS•OL078-GIC <br /> E: Thomas M. Gau,Deputy Director/Development <br />