Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-36 <br /> Table 9-240.2 in addition to a copy of the Grant Deed and an estimate for the <br /> required frontage improvements. The estimate and legal description shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing on a form to be supplied by the <br /> Department of Public Works and submitted to the Department of Public Works for approval. <br /> As an option,the Department of Public Works will prepare the drawing and estimate for an <br /> additional fee of$115.00. <br /> (Development Title Section 9-1150.2) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $159.10 per additional <br /> daily trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. The fee currently is $147.08 per <br /> 1,000 gross square foot of building as warehouse. The fee shall be automatically increased on <br /> January 1 of each year through the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 5. A copy of the Improvement Plan shall be submitted prior to release of building permit. <br /> GK:RWH:gn <br /> PS-8F I M G3 <br /> E: Manuel Lopez,Deputy Director/Development <br />