My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002787
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2353
>
2600 - Land Use Program
>
SA-98-36
>
SU0002787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 11:53:25 AM
Creation date
12/26/2019 11:34:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002787
PE
2633
FACILITY_NAME
SA-98-36
STREET_NUMBER
2353
Direction
W
STREET_NAME
WILSON
STREET_TYPE
WY
City
STOCKTON
ENTERED_DATE
11/1/2001 12:00:00 AM
SITE_LOCATION
2353 W WILSON WY
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-36 <br /> Table 9-240.2 in addition to a copy of the Grant Deed and an estimate for the <br /> required frontage improvements. The estimate and legal description shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing on a form to be supplied by the <br /> Department of Public Works and submitted to the Department of Public Works for approval. <br /> As an option,the Department of Public Works will prepare the drawing and estimate for an <br /> additional fee of$115.00. <br /> (Development Title Section 9-1150.2) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $159.10 per additional <br /> daily trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. The fee currently is $147.08 per <br /> 1,000 gross square foot of building as warehouse. The fee shall be automatically increased on <br /> January 1 of each year through the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 5. A copy of the Improvement Plan shall be submitted prior to release of building permit. <br /> GK:RWH:gn <br /> PS-8F I M G3 <br /> E: Manuel Lopez,Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.