Laserfiche WebLink
OPO.0 iN_ C e <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> THOMAS R. FLINN (�, <br /> w < fJ� e E STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR <br /> , (209)468-3000 FAX(209)468-2999 <br /> °4t FORN www.sjgov.org/pubworks <br /> THOMAS M.GAU l^ <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR R E C E I V E C) <br /> AUG 1 2 ?008 <br /> August 8, 2008 Community Development Dept, <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Patrick Crosby <br /> FROM: Bill DuBois, Engineer III <br /> Public Services Division <br /> SUBJECT: PA-0800183; A Site Approval application for a boutique winery with a production capacity of up to <br /> 3,500 gallons to include an existing 3,750 square foot building for wine production,barrel storage and a <br /> wine tasting room, located on the north side of Woodbridge Road, 1,700 feet west of N. State Route <br /> Highway 99 Frontage Road,north of Lodi. (Supervisorial District 4) <br /> PROPERTY OWNER: Russell & Melinda Fields APPLICANT: Russell & Melinda Fields <br /> ADDRESS: 3819 E. Woodbridge Road, Acampo APN: 013-210-29 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Woodbridge Road has an existing right-of-way width of 60 feet and a planned right-of-way width of 60 feet. <br /> REQUIREMENTS: <br /> The applicant shall complete the following requirements before the Department of Public Works can support or deem <br /> complete the application for this project: <br /> 1. Applicant shall provide a written statement to the Department of Public Works stating whether Surface <br /> Transportation Assistance Act (STAA) type trucks will be used as a part of the proposed operation. If <br /> STAA type trucks are to be used, a letter requesting designation of the proposed facility as a STAA <br /> terminal will be required. <br /> Upon satisfaction of the above requirements, the following Conditions of Approval shall apply. Additional and/or <br /> revised conditions of Approval may be necessary based upon factors resulting from the completed application. <br />