My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007297 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
3819
>
2600 - Land Use Program
>
PA-0800183
>
SU0007297 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 9:40:21 AM
Creation date
12/27/2019 9:34:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0007297
PE
2631
FACILITY_NAME
PA-0800183
STREET_NUMBER
3819
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01321029
ENTERED_DATE
7/28/2008 12:00:00 AM
SITE_LOCATION
3819 E WOODBRIDGE RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> JRPage 10 <br /> Consulting, Inc. March 19, 2009 <br /> Environmental• Engineering• Geology Project Number 2009007 <br /> Number of Percolation Tests <br /> 44total of two percolation tests where conducted. <br /> /Borehole Preparation and Presoak <br /> Two soil boreholes were advanced on the site with a Drill rig on March 12, 2009. A 2-inch <br /> diameter PVC pipe with perforations on the bottom was used to measure the drop of water in the <br /> percolation test boring. Approximately 2 inches of "gravel" were placed in the bottom of the <br /> open soil borehole,then the PVC pipe was installed on top of the gravel. <br /> Presaturation of the percolation test holes occurred 24 hours before each percolation test. The <br /> depth of water used to pre-soak was 12 inches above the bottom of the borehole. <br /> //Condition of the test holes after pre-soak <br /> After the 24 hour pre-soak,the boreholes appeared dry and intact on March 13, 2009. <br /> '-Percolation Test Methods <br /> Percolation tests where conducted on March 13, 2009 on two borehole locations. Percolation <br /> tests where conducted in accordance with EHD Policy 02-02 — Policy for Percolation Test. <br /> Procedure #2 was followed and a four hour percolation test was used. The last portion of the <br /> tests where observed by a San Joaquin County Environmental Health representative. <br /> An electric well sounder with depth accuracy of 1/100th foot was used to measure the <br /> depth to water to a fixed reference point at the top of the pvc pipe. All depth values on the field <br /> data sheet (appendix) are in decimal feet. After water drop was observed, the holes were <br /> checked for refill. The refill level was approximately 0.5 ft (6 inches) of water above the bottom <br /> JR SQUARED CONSULTING,INC. ENVIRONMENTAL•ENGINEERING•GEOLOGY <br /> 6532 MCNEIL COURT,VALLEY SPRINGS,CA 95252 PHONE(209)772-3841•FAX(209)740-4303 <br />
The URL can be used to link to this page
Your browser does not support the video tag.