Laserfiche WebLink
-2- <br /> Community Development Department <br /> PA-1900263 (SA) <br /> 2) The Regional Transportation Impact Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee will be based on the current schedule at the time of <br /> payment. (Resolution R-06-38) <br /> 3) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4) The developer shall provide drainage facilities in accordance with the San Joaquin County Development <br /> Standards.Retention basins shall be fenced with six(6)foot high chain link fence or equal when the <br /> maximum design depth is 18 inches or more.Required retention basin capacity shall be calculated and <br /> submitted along with a drainage plan for review and approval,prior to release of building permit. <br /> (Development Title Section 9-1135) <br /> 5) An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features, including but not limited to fences, <br /> walls,private light standards,rocks, landscaping and cobbles are not allowed in the right-of-way.) <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 6) Prior to issuance of the occupancy permit,the driveway approach shall be improved in accordance with <br /> the requirements of San Joaquin County Improvement Standards Drawing No. R-17 [return radii for <br /> truck-trailer egress shall be designed to prevent encroachment onto opposing lanes of traffic] <br /> (Development Title Section 9-1145.5) <br /> 7) The owner shall execute an Irrevocable Offer to Dedicate Road to result in a thirty(30)foot wide right-of- <br /> way from the centerline of Loomis Road to the property line across the parcel's frontage. (A fee based on <br /> the current fee schedule is required for processing per Development Title Table 9-240.2 in addition to a <br /> copy of the Grant Deed and a legal description of the parcel to be offered for dedication.)(Development <br /> Title Section 9-1150.5) <br /> 8) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. The fee will be based on the current schedule at the <br /> time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 9) This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant Discharge Elimination System <br /> (NPDES)permit and shall comply with the following conditions: <br /> a) A registered professional engineer shall design a system or combination of systems to infiltrate,treat <br /> and/or filter the 85th percentile storm drainage as defined in the 2015"Multi-Agency Post- <br /> Construction Stormwater Standards Manual"or in the"California Association of Storm Water <br /> Quality Agencies"(CASQA)publications and comply with the conditions of the County Phase II <br /> National Pollutant Discharge Elimination System(NPDES)permit. Standard"Best Management <br /> Practices"for the type of development proposed shall be incorporated into the system design. <br /> CASQA documents are available at littp://www.cascia.oriz Plans and/or calculations of the proposed <br /> system shall be submitted to the County for review and Approval Plan prior to clearance for plan <br /> check. <br /> b) The proposed project disturbs less than one(1)acre of ground and is not part of a larger plan of <br /> common development.The construction phase of the proposed project shall follow best <br /> management practices of the County"Small Site Storm Water Management Plan". <br /> c) Applicant shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works for <br /> review.A copy of the approved SWPPP and all required records,updates,test results and inspection <br /> 2 of 3 <br />