My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FIRST QUARTER 2012 STATUS SUMMARY REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
ARCHIVED REPORTS_FIRST QUARTER 2012 STATUS SUMMARY REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:56:07 PM
Creation date
1/6/2020 1:39:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FIRST QUARTER 2012 STATUS SUMMARY REPORT
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cv�K First Quarter 2012 Status Summary Report <br /> Former Tosco Bulk Terminal No.10013 <br /> April 30,2012 <br /> 1 <br /> ' Blanks (method) <br /> • Spikes (surrogates, laboratory control samples, and matrix spikes) <br /> • Duplicates (laboratory control spikes, and matrix spikes) <br /> ' Sample integrity (chain-of-custody documentation, sample preservation, and holding <br /> time compliance) <br /> • Lab qualifiers (to determine impact on sample results) <br /> ' Based on the QA/QC evaluation of above parameters, no systematic problems were <br /> detected and the overall data objectives were met. All samples were analyzed within the <br /> method-specific holding time criteria. <br /> ' The data reviewed are of acceptable precision and accuracy for project purposes. It should be <br /> noted however that, according to the laboratory analytical report, an A52 qualifier was assigned <br /> to detectable concentrations of TPH-d. The A52 qualifier indicates that the chromatogram for <br /> that sample was not typical of diesel. <br /> WASTE DISPOSAL <br /> Purge water generated during quarterly monitoring and sampling was temporarily stored on site <br /> in labeled 55-gallon drums, and removed on March 23, 2012 by an approved waste hauler and <br /> disposed of at the Crosby and Overton disposal facility in Long Beach, California. A copy of the <br /> waste manifest is included in Attachment C. <br /> ' QUARTERLY REMEDIAL ACTIVITIES <br /> No Active remediation is currently being performed at the site. <br /> RECENT SUBMITTALS <br /> ' ATC, Fourth Quarter and Annual 2011 Status Summary Report, dated February 1, 2012. <br /> • ATC, No Further Action Request report, dated March 30, 2012. <br /> ' FIRST QUARTER 2012 COMPLETED SITE ACTIVITIES: <br /> • ATC performed quarterly groundwater monitoring and sampling on March 5 and 6, 2012. <br /> ' SECOND QUARTER 2012 PLANNED SITE ACTIVITIES: <br /> ' ATC to conduct quarterly groundwater monitoring and sampling activities. <br /> Please note, the Board of Directors of ConocoPhillips announced that it would pursue <br /> the separation of the Refining & Marketing business and the Exploration & Production <br /> into two separate stand-alone companies. Phillips 66 will be a global refining and <br /> marketing company headquartered in Houston, Texas. ConocoPhillips will be a global <br /> s <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.