My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 10:40:56 AM
Creation date
1/7/2020 9:52:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Alternate construction for new underground storage tanks containing motor vehicles fuel [Section 26331. <br /> (1) Monitoring and response plan [Section 26341. <br /> (2) Underground storage tank composed of.... <br /> (a) Fiberglass reinforced plastic. <br /> (b) Cathodically protected steel. <br /> (c) Steel clad with fiberglass reinforced plastic. <br /> (d) Other material that complies with section 2631 and 2632. <br /> (3) Floor of leak interception and detection system constructed on a firm base and sloped to a <br /> collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br /> (4) Access casings installed in the collection sump of the secondary containment system with <br /> backfill in the interstitial space. The access casing shall meet all of the following: <br /> Designed and installed to allow the liquid to flow into the casing. <br /> Sized to allow removal of collected liquid and able to withstand all anticipated applied <br /> stresses. <br /> Constructed of material that will not be structurally weakened. <br /> Screened along entire vertical zone of permeable material. <br /> Capable of preventing leakage of any hazardous substance from the casing. <br /> Extend to the ground surface and covered with a locked waterproof cap. <br /> Capable of meeting S.J. Co. PHS-EHD Well Standards. <br /> Leak interception and detection system shall prevent the leaked hazardous substance from <br /> entering ground water. <br /> 14. INTERSTITIAL SPACE MONITORING <br /> A. visual monitoring [Section 2632 (c) (1)] <br /> (a) Exterior surface and floor beneath tank monitored by direct viewing <br /> (b) Daily visual inspections <br /> v"(c) Liquid level in tank to be recorded at time of inspection <br /> (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br /> has occurred. <br /> B. Mechanical or electronic monitoring [Section 2632 (c) (2)] <br /> ✓ (a) Continuous monitoring system connected to an audible and visual alarm system. <br /> Monitoring equipment to be installed <br /> Manufacturer: In eo <br /> Model Number: Z— <br /> J� Sensor Type: _ vapor X Liquid _ Both. <br /> Sensor/Panel specifications. <br /> Location(s) ,�for 'Insors: <br /> Tank: I'I,'-6,I � Piping: Ianlc .lw�U <br /> / <br /> Dispenser: 'Pan <br /> V C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)]. <br /> 15. Any special accessories, fittings, coatings, or Linings not inherent within the initial design of the 1` tank or <br /> double-wall UST. [Section 2631 (b)] <br /> A. Approved by a nationally recognized independent testing organization. <br /> B. Demonstration of integrity with the primary and/or secondary containment. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.