My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 10:40:56 AM
Creation date
1/7/2020 9:52:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Tanks subject to floatation. [Section 2635 (a) (7)] <br /> A. Anchored by deadman or slab. <br /> S. Anchors to be installed as specified by manufacturer. <br /> C. Installation details provided on plans. <br /> D. Calculations provided. <br /> 17. SPILL AND OVERFILL PREVENTION <br /> Underground storage tank equipped with spill container and an overfill prevention system. (detail drawing of spill <br /> container(s)/piping sump(s) required, including tank fill and all openings). <br /> A. Spill container (Section 2635 (b) (1)] . <br /> if made of metal, exterior wall protected from galvanic corrosion. <br /> /Capacity:Capacity: (minimum of five gallons) <br /> ✓Equipped with a drain valve which allows drainage of spill into primary container. <br /> /_ <br /> /'Manufacturer: <br /> C�I <br /> V B. Overfill prevention system does not allow for manual override and meets one of the following requirements: <br /> (1) Alert transfer operator at 90% full by restricting the flow into the tank or triggering an audible <br /> and visual alarm [Section 2635(b)(2)(A)] . <br /> Manufacturer: Model: <br /> (2) Restrict delivery flow to the tank 30 minutes before overfill when tank is filled at no more than <br /> 95% capacity and activates an audible alarm at least five minutes before overfill (Section 2635 <br /> (b) (2) (B)]. <br /> Manufacturer: Model: <br /> (3) Provide positive shut off at no more than 95% capacity [Section 2635 (b) (2) (C)]. <br /> Manufacturer: f'mo (A)hP2��^ Model: Ito( <br /> (4) Provide positive shut-off of flow to the tank so that the fittings on top of the tank are not <br /> exposed to the product overfilling [Section 2635 (b) (2) (D)]. <br /> Manufacturer: Model: <br /> 18. PIPING INFORMATION <br /> PIPING INFORMATION TANK# NO TANK# TANK# <br /> DISTANCE from <br /> DISPENSER to TANK <br /> MANUFACTURER T Q I <br /> SYSTEM TYPE �T,ssoF( <br /> CONSTRUCTION <br /> MATERIAL *** Fr r6o 1 }] <br /> LEAK DETECTION SYSTEM <br /> 100% METHANOL COMPATIBILITY YES X NO <br /> CORROSION PROTECTION YES NO <br /> * System Type; suction, pressure, and gravity <br /> ** Construction: single-walled, double-walled, lined-trench, etc. <br /> *** Material Type; steel with cathodic protection, stainless-steel, fiberglass reinforced plastic. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.