Laserfiche WebLink
Brad Parsons -3- March 19, 1984 <br /> Generator Inspection - Mobil Oil Company <br /> VI. Discussion with Management <br /> The inspection of the Mobil Oil Company facility was conducted on <br /> February 16, 1984. The contents of the generator checklist and all <br /> the applicable requirements imposed by the DO11S and EPA were dis- <br /> cussed with Mr. Kelly. Also, violations were discussed with him as <br /> were noted. Mr, Kelly was told that an inspection report will be <br /> sent to him in the near future. <br /> SZ:st <br />