Laserfiche WebLink
® w _ .M, m m�rt p I I <br /> _ _..__ _..______.._ _.__..__ .._.____ ._...__ _ .__.- _____._- ._......__. ._._......___.__..___.._..__.._,__.._..____._,,.______... ._-_.._.-__._._ ___.. ____ __ _. _ _._. <br /> _._ ,_,. ._ _ ,_ ._____ ._ ._ _ __. _ _ _� _.. _ _ _. ._ , _ __ m,. <br /> ____,_ _ _ _ _,m, _-_._._ __ ._ __ ___..___. ____ _. _.___._ ... <br /> PLUMBING ISCHEDULE <br /> PLUMBINGSHEET L� _ LEGEND <br /> PLUMBING <br /> . ......._..._.....__ ...._...___ ._.__.._._..._.._._..___..._.. ........_.._..._._________..._......_. ,.._,_.._.__._. .......__..__.___..._.__-____-.'... _________.._______.._..._.___.__....___. .....___..._.-.__-._'_ .-___...__..___._ .._._-...._..__ _____._...._...®___.._......__..._...__.......__.______.__.._._..__.®__._.___.._..._.__.__....,...._®...._..._._.-.___......._,....__.v_.®._._.......__._...®_.___.._.___.__. ........___....._.._.....,.,__.____._._..,_.,.___......_. .__.__ .__._..__........._.__.._____._.._..__....___._.._.__._._..___._,.._......___........_._.__._._..._.....___.__.._ __. r ._.... <br /> I � 1 <br /> i 1 : <br /> FF_ _ ___.....______ ... ____.__._ _,_ ._._.__..____._._ ______. _. _.___._._.__.__._ _..___._._ ._._._._ _ .._._ I T ~ �KK CW ._. CO I..D Va AI ER , : I <br /> WATER Sl1PPLY DRAIN PIPE SIZES REMARKS -) F'I._UMBING SCCI�-�I�RULES CALCULATION`S, & GEN. NOTES ; � : : i <br /> I CONTRACTOR 'rt) EXAMINE THE PROF'{)SE[7 WORK SITE AND BECOME FAMILIAR WITH ALL JOB CONDITIONS TAG FIXTURE TYPE MOUNTING MANU. M(}DEI.. NG. -__..___. .____, .._.. __ _....__ ... ____.. ....__..__._._ -.- <br /> HGWN. CONTRACTOR(S) SHALL FIELD-VERIFY SITE CONE)ITlGN5 INCLUDING LOCATIONS AND MANU MODEL Na. GPM/GPF _ TYPE SIZE WANE Y VENT' _ WYYYY CW HW_ �_.._. ____._ ._,.. ...._. ._._._._ _._.._ <br /> AFFECTING THE WORK S ( ) r <br /> RS ETC. AND BIDS SHALL BE BASEL _._._____ _ __ ._._.__.,_____._._.._,.__________ .__..____..__._.___ ___ _ _,___ ... __ _ _. _ <br /> SIZES OF EXISTING PIPING, VALVES, CLE.ANOUTS, WASTE MAIN_,, GAS METE _ _ _....___- _.._ _.__.__ _..__- _..... __....__ 1TE ------ HOT WATER <br /> SEE KITCHEN <br /> ON ACTUAL FIELD CONDITIONS, NO ADDITIONAL ALLOWANCE WILL BE GRANTED DUE TO LACK OF KNOWLEDGE OF DW-1 DISHW'ASNER COMMERCIAL GRADE KITCHEN PAN - C)II<ECT 1-1/2" ?" 1- 1/Z 1/?" 120°F INPUT TEMP TO BOOST'EFi PER KITGIIEN PIANPi -_._.- HW 1 <br /> AN COMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JQBSITE, INCLUDING , L F) .._C.�M N I N Ca -)I._AN <br /> SITE CONDITIONS. ACCEPT SOLE D .„_.._._..._ <br /> SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. SEE KITCHEN � `IEE KITCHEN �...__ `� 4n T -- HAP ----- HOT WATER RETURN <br /> IM-1 ICE MAKER ICE MAKER KITCHEN KITCHEN _,__ ____.... _.. �__. __ _._..... _ __._ _. .....__. ....__.._.__...____.__..,_.___._..._...__________ _,_.._ C J I(�Ca �F ( AN _ F C C��" ( .• F_I AI 0 y <br /> EE KITCHEN <br /> PIAN PLAN PLAN ) ) <br /> 2 DRAWINGS INDICATE DIAGRAMMATICALLY THE ARRANGEMENT OF PRINCIPAL APPARATUS, PIPING, DUCTWORK, AND _.___ ­____1_.__.__ ___ _.._, _ _.-,. ..._. -P*- - _.. _.. PLAL-. .-----®. _. -- . -.....-._ <br /> I.Y AS POSSIBLE IN ORDER TO ACHIEVE A NEAT INSTALLATION SEE KITCHEN _ SEE' KITCHEN NATURAL CAS <br /> OTHER MATERIAL. FOLLOW DRAWING AS CLOSE -._ POT FILLER KITCHEN 1/2° <br /> �, FF 1 PGT FILLER _ _ -_ _ _ __.............__..__...__....___„_..._..__._____.._. <br /> STILL WORKING AROk.1NE) ANY Gi3STRl1CT(C1NS. INSPECT SITE CONDITIONS AFFECTING THE 4MaKK AND PLAN PLAN <br /> WHILE _._..__.__._.. _..._. ..._._..__-_..........___ _.__._._____..__....._.__... .. _ _.._.__ ...._�___..._. <br /> PROVIDE FITTINGS AND ACCESSORIES AS REQUIRED TO MEET CONDITIONS WHETHER SHOWN <br /> OR NOT. _-_..._......__ ..........____.__.__........._.._.._._..,....._._,. _�___-..._.............._.__.._.... _ ___.._____ . ___ _____ ._.m..______..._. _ _ _..__ ._...__....... <br /> FTEI)IJCED PRESSURE � , .. _ _ _ -.. - - 2>' - LEAD FREE SS BC)DY _._.,_..___,___,._......_._.�....,______,...,-..__,._._._._,,..,_._...____,._,.,..,_..,_,..__...______.-.._____,..__.__...._.-._.._......._._..______..._._. - <br /> RP-1 BACK FLOW PREVENTER TONE WATT".a LFQ09M2CTI'll <br /> ___ _._SS__ - SANITARY SEWER �. i �__ <br /> OF THE PLANS AND SPECIFICATIONS TO COVER ALL INCIDENTALS REQUIRED rG PLUMBING 3 IT IS NOT 'THE INTENTION _.___ ___ _.. __. _ ..._._. _....._.__ ___ ___-.... ._-._..._._- _._... _ _ _ _._... _._ _ __.. __._._____.. _._,._. _.._._____,_.____ ._.__._. <br /> M. . THE CONTRACTOR IS TO <br /> FURNISH ALL LABOR _ ...._____ _..____ _._ ,....____-._____ .__.____. _. _,._.._.. .5EE _ SEE.. <br /> Y-OPERATIONAL SYSTEMS, SEE KITCHEN SEE KITCHEN SEE KITCHEN _ <br /> PROVIDE:. COMPLETE AND FULL <br /> ACCOMPLISH KITCHEN KITCHEN P­-TRAP 1-.1/2 2" 1-1/1" 1/2" 1/2" <br /> �, � MISCELLANEOUSERVICES ETC. REQLIIRED TO ACCQMPLISII THIS SK--1 SINK HAND PLAN PLAN ._....._._.__.__.____,__...__._......_______................___.___.-._......__._..._._......_.___......._.......____,_,--_..,........__._._,.__...........,__...,... _.__..-_.__.__....__, .._.____,.............____... U, <br /> MATERIALS, 'TRANSPORTATION, EQUIPMENT, S PLAN LA _„___.._...__-_.._,......____. ,_ ----SSV----- SANITARY SEWER VENT 1 <br /> Y CONSTRUED AS A NECESSARY PART OF THE INSTALLATION ' <br /> NY PNU WHICH MAY BE REASONABLY _ ___.._ ....._.._ __. ____...____._. _.___.__.______.__,,..__ _._..__._.._..__. __._J' _ ____.____ ._ _ ___.-.._, _, __.._.., ____ _ _ _._____-___.___ ._ ____. ._ __ _....__-.. <br /> RESULT. A. rHINSTALLATION AI_�_ C�OLD AND HOT WATER PIPING AND FITTING:'S <br /> , <br /> SHALL BE INCLUDED, WHETHER SPECIFICALLY SHOWN OR MENTIONED OR NOT. ENGINEER WILL PROVIDE SEE KITCHEN SEE KITCHEN EE KITCHEN _ Q F <br /> L SK--2 SINK PRE-RINSE PLAN KTfCHEN PLAN KITCHEN PLAN INDIRECT 1/7 2r'__. .__1-1f2'...___ ...._1 ___ _._...� <br /> ' _ .._ ., VTR VENT THRU ROOF <br /> INTERPRETATIONS UPON REQUEST <br /> _.._ ...__.._..._ ___..____......_.-........__ ......._ ......_....__._........._._.__ __.____.. .-__ FOR NEW F I X Im(J R F S <br /> AND MATERIALS SHALL BE PERFORMED AND iNSTALIED IN COMPLIANCE WITH THE FOLLOWING CODES SEE KITCHEN SEE KITCHEN SEE KITCHEN _ <br /> 4) ALL WORK SK-3 MNK PREP KITCHEN KITCHEN INDIRECT 1 1/2" 2" 1 1/2° 1/2" 1/`2" <br /> r PIAN PLAN PLAN AFF ABOVE FINISHED FLOOR < <br /> CALIFORNIAUILDING CODE, _ __ ..__., __ _,_._. ___ _..__ _ ____ <br /> I AUTHORITY(IES) HAVING JURI,>DIC,TIGN. _ __.._. . ..__.. ___ ............. ___ ____. ____...._ _ ._...._._..._ __ _..___............. _ ... _ _ <br /> ASAMENDED AND ADOPTED BY THE ( ) _._..__........._.. __,_....._....__. .._.__....._....__...__.....___.. ......_..� ____,_..____._ _. _.......__ _. r r <br /> (- <br /> CALIFORNIA MECHANICAL CGDE, CALIFORNIA PLUMBING CODE, CALIFORNIA ELECTRICAL CODE, CALIFORNIA ENERGY SEE KITCHEN SEE KITCHEN SEE KITCHEN <br /> NA SAFETY AND HEALTH ACT SK 4 SINK TRIPLE PSN KITCHEN PLAN KITCHEN PLAN INDIRECT 1 1/2" 2" 1-1/2" (?) 1/2" (1) 1/2" <br /> PROTECTION ASSOCIATION NFPA , OCCUPATIONAL _. ._. ._...._____.._ ._.____..._ _._ _.__. _.____._.__... .._ ._ _-.__._.___..._ INS I�ALLATION OF- AI._I._ SEWER AND VENT PIPING AND FITITINGS FOR � l �_- <br /> CGDE (TITLE 24), NATIONAL EIRE PROLE ( ) .... BF BELOW FLOOR _ <br /> (OSHA), AND ANY OTHER LOCAL CODES, ORDINANCES, REGULATIONS, OR AUTHORITIES HAVING JURISDICTION. .P.LIN...-._--.-.........._-___-................ -. - ---. ..._.____........._..._ _..-.... _.._......................... _ _.___................_ ___.... <br /> 1 - �� r` � v G <br /> ES <br /> NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES OR NEW F I X ��F� <br /> OTHER CODES AND REGULATIONS APPLICABLE TO THIS PROJECT. THESE CODES SHALL DETERMINE MINIMUM <br /> REQUIREMENTS FOR MATERIALS, METHODS, AND LABOR PRACTICES NOT OTHERWISE DEFINED IN THESE EXISTING I { GREASE INTERCEPTOR FA, TB FROM ABOVE, TO BELOW <br /> SPECIFICATIONS. `` <br /> _.___....._ ____.__..____._ . _.___.__.__...._......._. _________.________. .__...._.........___............__.......____............_...._.-.._.._ __..w..............__.._.........___.............___._,__ _.__.______......__.,...-_._.._..............._, INSTALLATION O F AI_F_ CAS PIPING AND FITTINGS I N C S FO[- N FW K I�C N N <br /> l � a�-. FB, TA FROM BELOW, TO ABOVE <br /> 5) DEFINITIONS: TOTAL VOLUME GREASE MAX SOLIDS ORIFICE �} tt__ <br /> ca. WORK: LABOR AND MATERIALS OF THE CONTRACTOR AND/GR SUBCONTRACTOR. SYMBOL MANU. MODEL (GAL) CAPACITY (GAL) CAPACITY (GAL) SIZE REMARKS EQUIPMENT I�D M L.N1 <br /> AIN COORDINATE SUBMIT THE NECESSARY DRAWINGS, DELIVER TO THE JOBSITE IN NEWFU FIXTURE UNITS <br /> b. FURN15E-I. OBTAIN, , <br /> CONDITION AND GUARANTEE, JENSEN <br /> PROVIDE: FURNISH AND INSTALL. GI_-1 JP150aG 1500 819 540 4"' .w _.__....__.___...._.._.._____._ ____ _....__nm______.._ _------------.--------.--------_-- R MINUTE <br /> d, CONNECT: BRING SERVICE TO THE EQUIPMENT AND MAKE FINAL ATTACHMENTS INCLUDING NECESSARY PIPE PRECAST <br /> __.__ __ _..__._...__... _ ........._.._. ........._...._ _...._.- _.....__................ _._._.._. ____._.___..__..._ ___ _.__. __..___._...-_... _.__ _ _--...._..__...._ <br /> .........__........ __.__._._..__........._. -._.._.,_..__._.,,._.__..-._ ..__._.___.. _._.._.-_ <br /> FITTINGS, DUCTWORK, TRANSITIONS, ETC, PIPING GPM GALLONS ,.. <br /> e. CONCEALED: HIDDEN FROM SIGHT IN CHASES, FURRED SPACES, SHAFTS, ABOVE CEILING, EMBEDDED IN ________.____........_..,_.__-__.,.._._-_..__......._.._.._......._._..._..,___._.___........_,________._,_._.........___._._.........._..._._._.,............._.__.._._..._.-.__................____..,..._. -._-_..___.__.....___..._._...___-..._......__......_._...__.__.____ <br /> CONSTRUCTION, IN CRAWL SPACES, OR BURIED. - SCHEDULEER THERMOSTATIC MIXING VALVE <br /> S D: NST INSTAI.,LEL> UNDERGROUND aR CE)NCEAI.ED AS DEFINED ABOVE. _,......_._._._._.........._...............____._.._._._______. --._..._..._..__.-...__.___.__... __..........._.._..._..._................_....___.........._...___.._._.__. ..__...,_._...__-___....._....___.........._._............._....__.-_...__..........-_.........._....._.__ .. 'IMV , <br /> f, EXPOSE EXISTING <br /> PERFORMANCE CONTRACTOR SHALT_ PERFORM ALL WORK SPECIFIED, INDICATED, AND REQUIRED UNLESS TYPE SITE JOINING METHOD NOTES <br /> S INCLUDING FINAL CONNECTIONS, IN A WORKMANLIKE MANNER USING WORKERS SKILLED _.-..- _..__._ __.._.__.__ __..__..._ <br /> OTHERWISE NOTED, SANITARY WASTE BELOW GRADE ALL SOLVENT ABS POG - POINT C)F CONNECTION ISSUED�c,r� r,nTt <br /> PIPES FIXTURES EQUIPMENT, GRILLES, REGISTERS, ETC. TO BE INSTALLED RECOVERY GAS INPUT CAPACITY ____....__._-__...___. _._____.._____ __.1.__­___._..._­_._ <br /> AND EXPERIENCED IN THE TRADE �` l <br /> , SYMBOL MANU. MODEL LOCATION AT 60'F Qlr (MBH) (GAL.) VOLTAGE REMARKS ___.......__....____._.__,______..-.__...._.. ._.__..........______..__. _.._..._____,..._........-_._-,_._......___._.__...,_.____ ___ <br /> LEVEL, SQUARE, OR CENTERED, ETC. TO GIVE A NEAT APPEARANCE. SANITARY WASTE ABOVE GRADE ALL SOLVENT ABS <br /> _ . _ , CLIENT REVIEW 10-11-'1� <br /> - � ) T AND FULLY FUNCTIONAL __._.__..__,____..__..___..............____.._.....__... _..--_,__....,�._.._._..._. <br /> h. FULL FUNCTION, PROVIDE ALL MINOR ITEMS NECESSARY FOR A COMPLETE ._._.,....__._,__,._ ___.......__..__ __...................._ _.__.-._-.__.._____.........__...______-__._.�._.__.._-___.__,________........._.__.__... __...... __..._.._. _........._.___ _._._....._-__._...... __.__.... _....____.__.__._ _.__ ___. <br /> SANITARY VENT ALL SOLVENT ABS {TAS <br /> INSTALLATION. <br /> WH--1 RHEEM G75--15N--1 KITCHEN 121 75.1 75 115--10-60Hz -- _._....._._._._...._____......__.....______"__.._._.__ _....-.__..._._......_.._,...__._._.. __._ _._______._._______. ___.__...._.___..__...........___._._._.__....____.._........._...____.._...._._.._..._,..._........._____ <br /> SITE <br /> __._..__.... ___ .._.. _ _._. ®..._._ __...... ___..._ _... _._ CONDENSATE: PIPING ALL SOLVENT PVC <br /> 6 CONTRACTOR SHALL CONFIRM ALL .SITE VOLTAGES BEFORE BIDDING AND ORDERING EQUIPMENT. REIMBURSECOLD WATER POG <br /> ELECTRICAL CONTRACTOR, AT Na CHARGE 'fC) CLIENT, FOR ELECTRICAL CONTRACTOR'S COST INCURRED DUE TC) <br /> CONDENSATE PIPING EXPOSED ALL SOLVENT PVC (PROTECTED WITH WATER.-BASED LATEX PAINT) - ) <br /> SUBSTITUTION OF MECHANICAL. EQUIPMENT HAVING ELECTRICAL REQUIREMENTS DIFFERING FROM SITE CONDITIONS. ._........._..._..._,__..._..__._._..._._.._._,_,_..._,._..__ ___..____.............._.._......._ _.__....._._.._.._..______........._.._... .. .___.._.__.__..___..._.__.._.__.__.,.._.........._..._.._..,_....._.._.._____.._......___._. CONDENSATE POC <br /> GAS PIPING BELOW GRADE AL,L, CGhMPRESSION POLYETHYLENE M ; <br /> 7 CONTRACTOR SHALL PROVIDE THE OWNER WITH COPIES ()F OPERATION, MAINTENANCE, AND PREVENTATIVE _ _, _._.._._....._... _m__. _--...._..... ...._ _. __­.1.____.._.....___ _..._._.._ ___ _._....._ __.._.._ ­_1__...­____­­_1_._ <br /> GAS PIPING ABOVE GRADE ALL THREADED GALVANIZED STEEL <br /> MAI NTE <br /> NANCE MANUALS FOR EACH MODEL <br /> AND TYPE OF Pi...UMBING AND MECHANICAL EQUIPMENT, r <br /> ________ ___ __,._ ____ _...._.._____............._.._. __....___ ,.__.. _ _...._..____,,........__ ....____......._-..__ _............___..._._._ .___,._,_ ,...__-_.._.._.....__._.___.._...... <br /> [W_ <br /> DOMESTIC WATER ALL 95//5 SOLDER TYPE "L'° OR '°K" COPPER W/SEISMIC BRACING FLOOR SINK WITH TRAP POC �� <br /> 8) CONTRACTOR SHALL PROVIDE EVIDENCE OF' LICENSING, BONDING, AND INSURANCE, AND PROVIDE OTHER <br /> NECESSARY ADMINISTRATIVE FUNCTIONS FOR CONTRACTOR'S WORK, <br /> ✓' C <br /> ( CLEANOUT rJ-1 <br /> r_ �> <br /> 9) CONTRACTOR SHALL PROCURE AND PAY FOR ALL REQUIRED PERMITS AND SERVICE CHARGES. <br /> xa "-) <br /> FLOOR DRAIN J y"' ,,4 r <br /> 10 COORDINATION: CONFORM TO GENERAL CONSTRUCTION CONTRACT DOCUMENTS EXCEPT AS MODIFIED HEREIN. <br /> REFER ALSO 'TO STRUCTURAL. AND ELECTRICAL CONTRACT (.DOCUMENTS. COORDINATE ALL WORK WITH OTHER <br /> fs �- iL> <br /> TRADES. 1 <br /> iylll � 0) <br /> E9 ,FL.0OR SINK <br /> 11) GUTTING AND PATCHING: CUT AND PATCH AS REQUIRED. CUT OR WELD STRUCTURAL MEMBERS ONLY WITH ca <br /> APPROVAL OF A STRUCTURAL ENGINEER, PATCHING SUBJECT TO ACCEPTANCE BY OWNER. g - -_ <br /> [�E7 TRAP PRIMER 5� ., M <br /> I. a? %a <br /> 12) SAW CUT TRENCHES IN SLAB SHALL BE FULLY RESTORED AND REINFORCED TO PREVENT SAGGING. ROUGHEN <br /> SAW <br /> CUT EDGES PF21OR TO RE POURING CONCRETE. E. <br /> WATER HAMMER ARRESTOR11 <br /> a-) N <br /> 13) COORDINATE ALL WORK WITH OTHER TRADES 'TO PROVIDE A COMPLETE INSTALLATION, CONNECT ALL EQUIPMENT t , as <br /> FURNISHED BY OTHERS AS REQUIRED. INSTALL ALL WORK TO CLEAR ARCHITECTURAL AND STRUCTURAL "� ca` <br /> A HIGH AS PRACTICAL. HOSE BIBB ' /�� -LLJ , <br /> MEMBERS. INSTALL ALL ABOVE GRADE (OVERHEAD) PIPING S <br /> 14 RESTORE ALL DAMAGE RESULTING FROM YOUR WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN FINISHED � � I �, <br /> BALI<FI-aW PREVENTER <br /> WITH WORK, ADJUST, CLEAN, REPAIR, OR REPLACE PRODUCTS, WHICH HAVE BEEN DAMAGED. t.� C� <br /> 15 GUARANTEE ALL, WORK AND MATERIALS FOR ONE YEAR MINIMUM FROM DATE OF FILING NOTICE OF COMPLETION, I,, SHUT_-OFF VALVEEngdo, CRN) <br /> 16) PROVIDE FLASHING AND COUNTER FLASHING FOR ALL WALL AND ROOF PENETRATIONS. <br /> INSTA--HOT WATER HEATER <br /> 17) ADJUSTMENT'S: MAKE MINOR ADJUSTMENTS TO WORK WHERE REQUESTED BY OWNER, WHEN SUCH ADJUSTMENTS <br /> ARE NFCE`.>SARY TO PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACT, WATER AND SEWER SERVICE CAL "I <br /> Q <br /> 18) MATERIALS AND EQUIPMENT: PROVIDE NEW, UL--LISTED, COMMERCIAL-GLADE MATERIALS, DEVICES, EQUIPMENT, ---_----.---•_.----- --__---.--..----_-__.-.-----_.._ .. .. ..-........_--_...... ........._ „-.-.--..._.-.--_.----..-.-. .-.--_.. -....-.-.-.-_-_.---_-.-.�- --`.•.--�-_.._..__.__...._....._...__. .... <br /> PUMP (o ' <br /> TOTAL_ <br /> AND FIXTURES SUITABLE FOR THE ENVIRONMENT WHERE INSTALLED, REUSE EXISTING ONLY WHEN COMPLIANT SEWER COLD WATER F 1OT 1�VRTE RWITH THE. CONTRACT DOCUMENTS, IN GOOD CONDITION, AND APPROVED BY THE ENGINEER. F=IXTLJRI=. TYPE NO, WATER _____.___.__.�..........._._,....._.._.__...__....._.__...__...,_....._.__..._.......__......._ <br /> _._ .................._......_ .__..__._._________. __....-.._.__._.__,________.__.______.--__ _..____.__,_______.. _______._.__.__._._1____­____......- <br /> FL! TOTAL FIU TOTAL FU TOTAL_ FU <br /> 19) INSTALLATION: INSTALL ALL MATERIALS, EQUIPMENT, AND SYSTEMS IN FULL ACCORD WITH MANUFACTURER'S "..,_ r ___ __.__._ _ __ - -- <br /> INSTRUCTIONS, PR[1PSIPJFC 1 2 2 ? 1,5 1 2 <br /> ----------.­1-------I------­­- < <br /> PRE RINSE SINK 1 2 2 2 2 1,5 1.5 2 <br /> 20) LAYOUT: INSTALL ALL PIPING AND DUCTWORK 10 PRESENT A NEAT AND ORDERLY APPEARANCE. RUN ALL L..INES2 _._____ __ <br /> PARALLEL WITH BUILDING CONSTRUCTION AS MUCH AS POSSIBLE. MAINTAIN HEADROOM, EQUIPMENT CLEARANCE, _.._. __. ____ _-. ____.... __ __ __ __.__. __ _ _____.___ _.___.___.._.___..._.._______.__ ..�__..__._.___ ---_----_�_._ - ._.__._.._ <br /> DISHWASHER 1 2_ C'7 0 1.5 1.5 1.5 2 <br /> AND GRADIENT WHERE REQUIRED. ALLOW FOR EXPANSION CONTRACTION. _ _ ____. ________ __ __ _._ ____ _ _ _ _ __. __ _.. ____ _ _.__,_. _.___ _.__,_ _______ <br /> POT FILLER 1 0 O 2.5 2 5 0 0 2.5 <br /> ACCESS DOORS: PROVIDE ACCESS DOORS OR PANELS FOR ALL VALVES, CLEANOUTS, DAMPERS, CONTROLS, _..._____.__.__...__,_.._.__..._.___.__._.__.___...____­_.___11_­­_­ .- _._...__.__..__.... _._ ____..___,_ _­_____1­.1..__.__1___.1__ ,_ __._ _. __._.__..__,__,..___ _._..__.___.______,_____.________, <br /> 21) _ -_...--I'--,----- <br /> DEVICES, <br /> ___,_ <br /> DEVICES, AND OTHER ITEMS REQUIRING INSPECTION OR MAINTENANCE. --.--AND SINK ? ? 4 1.5 3 1,1__ - __5 3 <br /> 3-COMPARTMENT SINK 2 3 6 ;2 4 1,5 ,3 4 <br /> - THOROUGHLY TEST AND DEMONSTRATE PROPER OPERATION OF ALL SYSTEMS AND EQUIPMENT _,______.._...._..._._________.._._._...______.................._.... •...,_ __..._____.____..,___ _...___._._ _.._._,_...__._.....___,____...______....----_,.___..._,_ ...,..____...__.____._.___.__.._.__.___._"..___._._._..__..___ <br /> 22) START OF. T __..._ �__ ___ ____.... _.___.___ <br /> MODIFIED, FURNISHED OR INSTALLED UNDER THIS CONTRACT. MISC ECQLJIF�(ICE,S---- COFFEE) 3 1 3 a 5 1.5 O 0 1 5 <br /> ENSTING DEMAND 1 35 35 10 10 3.75 :3.75 '10 <br /> 23 WARRANTY: ALL MATERIALS AND EQUIPMENT INSTALLED UNDER THIS CONTRACT SHALL BE GUARANTEED FREE _._. ..........._.........._........._._..___�._..................__._...__.__.._.......__..__.____ __....._...............__-_____._..__.___._.____ ____________ __________._.-__._____-_____. __ <br /> _1 _. ___.,__.._____._______._.._ <br /> FROM ALL MECHANICAL, ELECTRICAL., AND WORKMANSHIP DEFECTS FOR A MINIMUM OF ONE YEAR FROM DATE __._..._______ <br /> _.__-.__.__... m <br /> OF FINAL. ACCEPTANCE, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO THE PREMISES CAUSED BY __TOTA....._.Ft..____ _ -.__ __._. _.___..-_,_........______...__...__--.._._.-.. _______________ __ V._...._...._- � -.._ _.__.____._.__ _ <br /> TOTAL_ Ft.) <br /> LEAKS AND/OR BREAKS IN PIPETS AND FIXTURES INSTALLED UNDER THIS CONTRACT, AS WELL AS ANY DAMAGE 04.0 25.0 13.5 20.5 <br /> FROM LEAKS VIA ROOF PENETRATIONS MADE AND SEALED UNDER CONTRACTOR'S SCOPE. ---__...._ -.-.-�.�---.--l.-..--- < <br /> EQUIVALENT COLD WATER FLOW RATE*(GPM). 118 <br /> 24) PATCHING & PAINTING: RESTORE ANY DAMAGE RESULTING FROM THE WORK AND LEAVE PREMISES CLEAN. _._......____.- __.._.______.. .... _._....___ . ....... .._,._.__--....--___,_._.,.... ...._..____._..........__......_,.-_ ..__..._____........._....... ,.._,_...__.__,. ___._.. <br /> Ill- ui <br /> ADJUST, CLEAN, REPAIR, AND/OR REPLACE ANY ITEMS DAMAGED BY THE WORK. RESTORE WALL. AND ROOF SIZING <br /> PENETRATIONS TO MATCH SURROUNDING WALL OR ROOF, RESPECTIVELY. ._.__-.......___....._. CALCULATIONS PIPE I INSULATION <br /> GAS GAS PRESSURE.AVAILABLE AT MAN (PSI): 50 <br /> _. ,__.. <br /> ......__. _,._._-__ __--....... <br /> _..,_..-- BASED ON CPC 2016 TABLE 1216.2(1), I...ESS , FLUID TEMPERATURE INSULATION THICKNESS <br /> MINIMUM REQUIRED FIXTURE PRESSURE(PSI): <br /> 0 :-- <br /> .._._...___._.._._.._._.--..__....___,_______,._..__.__._._.._.___._.._._.._____._._____-__,__..____.__...._.,_.._.___..____, ._______ _._._. <br /> GA�_F?IF' SIZE INFaRMATION: THAN 2 PSI I IF E SITE RANGE (`F) (E'ER CEG 120.:3) T:L..EVATION L-.OSS(PSI}; #OF FL,.(:)C)RS: 1 _ 1.3 <br /> PLUMBING METER LOSS(PSI): SIZE(INCHES): 1 2.4 <br /> GAS PIPE SIZING IS BASED ON GPC 2()16 TABLE 1216.2(1) FOR LOW ..___.____....- _. ..__-..-__..._,. ___._.__._____---_______._.._.___.,.___ _._______,_._._.__._,�.-.._ _ <br /> ...___..._____...____ _._____-_.___,____.__..__._.._.- ___._ .....______._____.__,_____._._.___,_.._._.__ .__-___._.__._,_____._____-. 1/'2" 105-140 1 <br /> PRESSURE. RUNOUTS TO APPLIANCES LESS THAN 3' TO BE THE SAME TOTAL PIPE LENGTH mm2.50° <br /> . _ 'LEVE FLUSH VOLUME OF ALL WATER CLOSETS SHALL NOT EXCEED 1.28 GALLONS PER FLUSH, E3AC1{F�i_QW PREVENTER LOSS(PSL): 10 u�, � <br /> 5,.30,3.3.1 THE EFFECTIVE .____ ._...._.__.....-_,.._.._._._..._._.._,_._._.._____.__.-__,__ <br /> TANK.-TYPE WATER CLOSETS SHALL BE CERTIFIED TO THE PERFORMANCE CRITERIA OF THE U.S. EPA SIZE AS APPLIANCE CONNECTION. S.O.V. AHEAD OF UNION, WITHIN 3' OF 3/4" 105-140 1 EQUIVALENT PIPE LENGTH FROM METER TO MOST REMOTE FIXTURE(FT): 300 ) <br /> EACH APPLIANCES. S.O.V. AND UNION SHALL BE AGA APPROVED. PIPE SIZE CAPACITY (CFI-9) <br /> WATERSENSE SPECIFICATION FOR TANK--TYPE TOILETS. �-w°"`"`"- " <br /> >1"' 105-140 1--1/2" -. .. ~---,_..-_-..m._. <br /> -_.___._......_..____.______.,w_..___._ _________.____jFRICTION LOSS PRESSURE AVAIL.AI3[_E(PSI): 58.30 zY <br /> 5.303.:3.2 THE EFFECTIVE FLUSH VOLUME OF WALL.-MOUNTED URINALS SHALL NOT EXCEED 0.125 GALLONS F'ER FLUSH. GAS INPUT 1/2" 30 <br /> r � _ MAXIMUM AI ALLOWABLE FRICTION 1 C)`SS(PSLl1a0 FT): 7,55 _ <br /> AL,L. OTHER URINALS SHALL NOT EXCEED 0.5 GALLONS PER FLUSH, EQUIPMENT BTU RATING _.____," ..._____.._,._ ._. ._a___ _,-___._____.___._.-.. __-.__ _._...-_.- - <br /> (GFH) _._._.._-._.._-__.___.._..___.,___....._____-__ _,.. .�__. ._.____. .._ .________.__________..... _. ___.__ _.,._.. _„___,._ ..__.__ __ � <br /> 3/4" 63 MIN11411.1M REQUIRED `WATER'PIPE:SIZE(INCHES): 1,25'. <br /> 5.203.3,3 SINGLE SHOWERHEADS SHALT.. HAVE A MAXIMUM FLOW RATE OF NOT MORE: THAN 2.0 GALLONS PER MINUI'Fm <br /> PERFORMANCE CRITERIA OF THE U,S. EPA AC--1 90,000 90,0 1°' 119 MINIMUM REQUIREED'SE::iPVER'PIPESIZE(INCHES): 1 <br /> AT 80 PSI SHOWERHEADS SHAH_. BE CERTIFIED TO iTiE F ERFO _________ <br /> WATERSENSE SPECIFICATION FOR SHOWERHEADS. WHEN A SHOWER IS SERVED BY MORE THAN ONE _-______._....._._..____......_...____.___._.._........__-_._._.._.�_...__-_._.___..___.___...---____.__-_._____.._.__..__...____._.__.__.-_____..__.._.._.._.-_.__.._...._ _._,_.._._.,... _ _...__ _- '" <br /> SHOWERHEAD, THE COMBINED FLOW RATE OF ALL SHOWERHEADS AND/OR OTHER SHOWER OUTLETS AG-2 90,000 90.0 1-1/4" 7...44 <br /> - ._ <br /> PER MINUTE AT £3a PSI, OR THE ___._,__._......._.______._......_.___..._-._ ___-__________._ .__.....___.______ __._.___-____._...._.._______...____ ___._._._____.___._._._______._.._._._. ._...._.__.,__._.___.._ __-_mmm_ _.._....._...._____._. <br /> CONTROLLED BY A SINGLE VALVE SHALL NC?T EXCEED 2.a CATIONS E r 80,000 80.0 1 1/2" 366 SIZE:TYPE E.COPPER CVVMAXFL�OVV C'VVFIXTUFRE:UNIT HWMAXFLO\N <br /> SHOWER SHALL BE DESIGNED TO ALLOW ONLY ONE SHOWER OUTLET TO BE IN OPERATION AT A TIME. STOCKPOT RANGE FIW <br /> ___...._.....__.._.._______...____..____.___.__._____.....____,_-_.__..._.___.____.__.____ ___._.___...,___.._...._.._ ____._.._______.____ ___.._.__._______....._.....___._..._..___.-.__...._..___...___._,_. _ <br /> WOK RANGE 2Q0,00L7 2001.0 2" 704 INTERNAL T�L.Jk-JSF-I FL-IJSFi FIXTURE <br /> 5.303.3.4 NONRESIDENTIAL LAVATORY FAUCETS SHALL HAVE A MAXIMUM FLOW RATE GF NOT MORE THAN 0.5 GALLONS NOMINAL DIAMETER GPM FPS GPM FE='S UNIT <br /> w"m9abli0l' LO F__ <br /> PER MINUTES AT 60 PSI <br /> FRYER 136,000 136.0 2-1/2` 1120 DIAMETER i T!-'_NK VAI,..VI <br /> fez 0.545 2.9 4.0 3 o 2.9 4.0 3 <br /> KITCHEN FAUCETS AND WASH FOUNTAINS SHAI._L HAVE A MAXIMUM FLOW RATE OF NOT MORE THAN 1.8 RANGE/OVEN 203,000 a.2 3" 1980 --,-.---------.W-----.--.-,.---- W-- ` -- .`°----, . ... _°._ °"" '- °�" "'. <br /> V THE 3/4" 0.785 7,5 5.0 10 0 7,5 5.0 10 <br /> GALLONS PER MINUTE <br /> AT 60 PSI. KITCHEN FAUCETS MAY TEMPORARILY INCREASE THE FLOW ABOVE _ <br /> MAXIMUM RATE, BUT NOT TO EXCEED 2.2 GALLONS PER MINUTES AT 60 PSI, AND MUST DEFAULT ,TO A CHARBROILER 70,000 10.0 ___1____­­_­.____.__._1_. _._,._._..._.._... H.. <br /> _......._..,..___.._.._.-_._..._........._._"_,_._.__..._,_.____.------ 1" 1.025 15.2 5.9 �1 0 12.9 5.0 18PLUMBING <br /> MAXIMUM FLOW RATE OF' 1.8 GALLONS PER MINUTES AT 60 PSI. WH_1 75,100 75.1 <br /> ....___ ............._________.-_--_..._......___--..__.._.._.___..._.._.-..__. ._....._______._ _.___._........._......._ _.-._..____....------__ __,_._..____ _.___ ____._._..___ __._... _. <br /> 1-1l4" 1.2.65 :1.6.4 6.7 44 G 19.E3 5.0 3C) <br /> METERING FAUCETS SHALL NOT DELIVER MORE THAN 0.10 GALLONS PER CYCLE. �_.._...........___._____....---_...............__ ___._.....____._.._.........._.....___. .___..___..____,__ -_._......-.........-..__-___. _,__ .__.__ __v__-___,_._ _.__ -- _ _-__.,_____.__._ __...__�...______-__.__._ _.._....._....___. } <br /> 1-112 1.505 41.7 7-,a 95 ?7.7 5.0 40 � <br /> _...____-___..-_.._.....__..._...___.__.,_..._.........___,____._.._.._____ _-,_.-.,.._..._�...._..____..___ .__.-.._._,,.__.__-_________",...._.__.___._..._____._��..._.___.­­1_.__1________.._1_.__­­_,_______4 _.---5.0___.__ ._.___��.�____._ <br /> 5i 0:3,5 FOR THOSE OCCUPANCIES WITHIN "mE AUTHORITY OF THE CALIFORNIA BUILDING STANDARDS COMMISSION AS TOTAL 741,303 741.3CALCULATIONS, <br /> 3 .2 1.,)85 77.E 8.0 �,..� <br /> SPECIFIED IN SECTION 103, THE PROVISIONS OF SECTION 5,303.3 AND 5.303.4 SHALL APPLY TO NEW <br /> FIXTURES IN ADDITIONS OR AREAS OF ALTERATIONS TO THE BUILDING. <br /> �� <br /> _ WITH INE. CALIFORNIA PLUMBING TOTAL, DEVELOPED LENG�11�1: 250 FT (C,AE. ULATIQNSPER TNE2O1fiC;F'Ci1F'PE:NCDIXA) NOTES <br /> 5.303.6 PLUMBING FIXTURES AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE <br /> CODE AND SMALL, MEET' THE AI'PCICABLE STANDARDS REFERENCED IN CPC TABLE 1401.1 AND CAL.GREEN .� ���� � .-�,_.�._....�._.__a._.___.��� ����� � <br /> SHEET NO, <br /> CHAPTER 6 <br /> 5.410.4.5 PROVIDE THE BUILDING OWNER WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF <br /> 3" I_QW PRESSURE GAS MAIN 0 250 FT Po <br /> GUARANTTES/WARRANTIES FOR EACH SYSTEM PRIOR TO FINAL INSPECTION. MAXIMUM CAPACITY = X,XXX CFH <br />