Laserfiche WebLink
SHEET NOTES: <br /> 1. (E) EXISTING <br /> - I <br /> (N) NEW <br /> _ <br /> (�d) RELOCATED � - <br /> (D) DEMO <br /> 2, ALL FIXTURES/PIPING ARE (N) U.O.N. <br /> SAWCUT (TYP.) <br /> SEE: PLANS - -#4 15" O,C, 3. PROVIDE APPROVED THROUGH I <br /> �> <br /> PENETRATION FIRESTOPPING METHOD <br /> -(E) SLAG ON GRADE / FOR ALL PIPING PENETRATIONS OF <br /> DRILL AND EPDXY <br /> _..w <br /> - <br /> n <br /> _ .�,_,_,_�._ �� ,, _ _-- _•--_.-� FAUCET- AIR GAP PER 201 G CBC 714, SFE DETAILS <br /> FLASLiING-------� � N - A ASSEMBLIES i <br /> I /- <br /> "" 4. ALL CONDENSATE CONNECTIONS TO <br /> COUNTER RCI(?FTQF AO UNITS TO F,3E 3/4"0 — - - --- i <br /> _ ___._,_ .._ _ _. _._.....� ,. FLASHING--_._,_._ S, ALL CONDENSATE f0 ROOF DRAIN <br /> AP <br /> #4 15" E.W. -._Ci0MPACTEDFBACKFIL..L. -5 8"HOSE ROOF ASSEMBLY 1, , PRIMARY A n <br /> _.._._ / (SEE ARCH.) 6 M Y ROOF DRAIN TO CURB <br /> NOTES: . TO VISIBLE OUTLET <br /> 5 FRAM DISHWASHER <br /> 1. TOP 6" BELOW SLAB SHOULD CONSIST OF A MOISTURE 1 1 2'� SSV VTR <br /> �� x <br /> 7/B" DISHWASHER -.-_ 10 <br /> BARRIER WITH A." OF FREE-DRAINING GRAVEL., SUCH AS 3/4", WASTE PIPE _ <br /> DRAIN HOSE 7. SEE ROOF DRAIN CALCULATIONS ON <br /> CLEAN, CRUSHED, UNIFORMLY GRADED GRAVEL WITH LESS � ... r--SHEET P(7 <br /> - <br /> THAN 3% PASSING #200 SIEVE, OVERLAIN BY A MINIMUM HOSE CLAMP <br /> rJ. <br /> 10-MIL THICK IMPERMEABLE MEMBRANE, THE MEMBRANEDISPOSAL «� i- <br /> SHOULD 'THEN BE COVERED WITH 2" OF SAND. VENT PIPING -- <br /> 2. IF COMPACTION CANNOT BE ACHIEVED DUE TO PHYSICAL `1 <br /> CONSTRAINT, THE 'FRENCH SHOULD BE BACI4FILd_ED WITH 1 TO <br /> 2 SACK MIX SAND SLURRY BACKFILLED TO THE 'FOP OF _. MOOR ----- <br /> TRENCH (IN THIS CASE, MOISTURE BARRIER DESCRIBED ABOVE <br /> WOULD NOT BE NECESSARY) <br /> ­--l- <br /> L?REQ 0.M® TPTTv m AIR _...___.. _,..._.m1I HW I MACHINE RAIN ___`'....... V NT T H FSO D H ROOF <br /> P2 <br /> 1.._1/2"0 SSV <br /> t <br /> � � 1 <br /> ISSUED FOR I DATE <br /> PROTECTIVE COVER (s) CLIENT REVIEW 10--11-18 <br /> THREADED PLUG_- <br /> -- FINISH GRADE <br /> 18 GAUGE ROUND__ <br /> GALVANIZED STEEL CO PLG (THREADED)- <br /> _._........,. _..._..._ UNION <br /> CAST IRON VENT TEE--\ <br /> OR STEEL <br /> A/C UNIT e . E <br /> �__GALVANIZED OR PIPE CLIP, SECURED 12" S _11wl _.,. <br /> _...,_._.._,.. � 1--1/2°� SSV-VTR...._.> <br /> 4 .... ( ...� <br /> , <br /> FO BLOCKING <br /> CAST IRON RISERS <br /> _ CAST IRON <br /> MM <br /> CLEANOUT TETE - '" - 2-WAY <br /> TO APPROVED -DRAIN PAN i '' � <br /> ACCESS COVER CLEANOUT RECEPTACLE S- r Ln <br /> - <br /> Jol Q0 - <br /> WASTE MAIN rx <br /> FELT INSUL,... o <br /> FINISHED WALL FULL SIZE CONDENSATE <br /> (N) 4x4 REDWOOD DRAIN W/ TRAP FOR __„_ w__ _� care_._ _ �7 era <br /> ____.. <br /> E�FLOW [ -P.O.C. TO 5'-0” SLEEPER_ WAFER SEAL_, TYPE "M" <br /> CLEANOUT PIPE' " " _.. OUTSIDE BUILDING _ ;t -1/2'°W GW FB � z cam.. <br /> COPPER Tt1BING W <br /> _ > <br /> ROOF OR GRADE-, <br /> (BY OTHERS) WRQUGFIT COPPER FITTINGS \.. m 0 <br /> CONDENSATE DRAIN ~ � <br /> SANITARY 1NAI_L CLEANOUT SANITARY FLOOR CLEANOUT 101 <br /> F �� - <br /> h : <br /> __(�"'}r� �_... ,,. <br /> %% LIJ <br /> c_5 <br /> _.__... �...Mm.m tr) 0 <br /> rMEMO <br /> ";,---SPOUT BRACE FROM -RAP PRIMER: <br /> VALVE SHOULD BE _ <br /> ....... _._ -- MOUNTED 1' ABOVEE-1 <br /> L <br /> GAS SUPPLY INLET_ _- FINISHED FLOOR I ----- -_. _ - --- --- <br /> 06 <br /> DRAIN <br /> -0 <br /> z x <br /> _ FINISHED FOR EVERY 20' OF <br /> --SERVICE FAUCET FLOOR 1 f4" ^ -- 1'-0" — PRIMER LINE <br /> 3 WITH VACUUM <br /> C ,0" BREAKERS <br /> TEE FITTING <br /> 1 <br /> TO EQUIPMENT INLET. _,._-_........m s _ ....... _..,. P <br /> �..._'. DRAIN <br /> D <br /> € <br /> NIPPLE _,... <br /> CAP 3" MIN. EN AFE TO O ROOF <br /> C <br /> ROUTE <br /> CONDENSATE E <br /> s <br /> DRAINv G <br /> _._,.._. _.... ._ -'POLYSLEEVE ( L <br /> NO-HUB _MALE ADAPTER TAPE <br /> 2"� P-TRAP CONNECTION POLYSEAL AT END ` <br /> € <br /> i s l <br /> 0 <br /> SEDIMENT TRAP_ e_ ....._ ''_v...... MOP SINK FLOOR. DRAIN <br /> I <br /> Lo <br /> UJ <br /> I <br /> i <br /> t <br /> I ; <br /> ( t [ f <br /> I <br /> t <br /> I <br /> i <br /> [f i <br /> 4 <br /> TEST COCK #2- ` <br /> -FEST COCK #3 <br /> FEST' C(.TCIf #1 VEST COCK #4 AIR GAP FOR FAUCET' ._ <br /> - _ , I <br /> BALL TYPE (TYP.) �� _-�`��.__- INDIRECT WASTE r <br /> 3 <br /> f <br /> M <br /> w ' I <br /> �._.. COUNTER TOP I ",. ._... , _,.,.- n••,.... ... ....... .. .... .... ,,.. <br /> .. ........._,... ...._.._.......,._„.._.., ............. .. r <br /> INSTALL FLUSH _ m <br /> WITH FLOOR 4co 0 <br /> M._,_ . _ I <br /> _ Cam <br /> I <br /> __ ..._._ ....._ �' • 4. ° Lu I- <br /> ..... 4 <br /> . t <br /> L <br /> SECOND CHECK µ _ °STRAI_,.,.�w�. WASTE PIPE - <br /> FIRST CHECK DOME STRAINER <br /> MODULE ASSEMBLY MODULE ASSEMBLY - —��--- <br /> --TAIL PIECE ADAPTER TO <br /> -- F CONDENSATE DRAINco <br /> REDUCED PRESSURE ZONE- RELIE.:F VALVE ASSEMBLY -WASTE TEE FITTING <br /> o <br /> .° FLOOR <br /> P--TRAP __ _. wm _,_ ,__mm__. _ SI i E E"E 111 L E <br /> PLUMBING PLAN <br /> BACKFLOW PREVENTER 1 c FLOOR SINK �...1 INDIRECT BASTE <br /> ROOF & DETAILS <br /> ____........_ _ <br /> SHEET N0, <br /> .SCALE, 1/4"=11-0" <br />