My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
969
>
3500 - Local Oversight Program
>
PR0545144
>
ARCHIVED REPORTS_XR0011056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 9:25:04 AM
Creation date
1/9/2020 8:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011056
RECORD_ID
PR0545144
PE
3528
FACILITY_ID
FA0025676
FACILITY_NAME
CARNATION USA/CARNATION PLANT
STREET_NUMBER
969
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
969 E FREMONT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�t <br /> Solt Sampling Protocol <br /> (fir <br /> i Sample Collection During Drilling Acti%rities <br /> A Proposal gill be s-ibmitted to the lead Regulatory Authority <br /> with proposed boring/sampling locations. The exact location <br /> and number of borings at each site will be determined in the <br /> � field by the Project Geologist/Engineer <br /> Prior to arriving at the sample site, the drill rig/augers <br /> will be steam cleaned and all sample equipment will be <br /> cleaned Cleararg will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> Soil samples will be obtained using a California modified <br /> split-spoon sampler containing three, sax inch long, two inch <br /> diameter crass tubes. The sampler will be driven 18 inches <br /> ahead of the nohow stem auger by a lop pound hammer 4ith a <br /> 30 inch drop in accordarce .pith American Society for Testing <br /> and Materials (AST'm) 4ethods D 1586-84 for split barrel <br /> ..ampling of soil and D 1587-83 for thin-walled tube sampling <br /> Of soils. The blows required to drive the sampler each sips <br /> _nch interval wall be recorded on the boring log. The <br /> sampler gill be removed from the boritig and opened to reveal <br /> the brass tubes The bottom tube will be capped wit.,-, <br /> aluminum foil and plastic end caps, taped and labeled with <br /> the follow,ng information date, time, ,project 1D, sample <br /> :D, name of sampler and type of analysis. This sample wall <br /> be :.mmediately placed into a cooler containing dry ace or <br /> frozen "olue ice" A "high-low" temperature recording <br /> thermometer will accompany sample shipments to ensure proper <br /> temperature maintenance. The samples will be delivered to a <br /> state cert+faed laboratory under chain-of-custody protocol <br /> within 48 hours of sampling, 4hen ever possible. <br /> Soil in the uppermost brass tube gill be described according <br /> to ASTM standard, practi-e for description and identification <br /> Of soils (ASTM D-2488-84) Stratigraphic, genetic and other <br /> data/interpretations gall also be recorded. Soil properties <br /> also be noted in the ;riddle brass tube and from the sampler <br /> shoe. Alternatively the second sample tube may be used with <br /> the uppermost tube for preparation of duplicates. These <br /> field observations will be noted on a log prepared tar each <br /> boring/ Jell <br /> During sampling, latex gloves will be worn to preve•,t cross- <br /> contamination with other samples. The disposable gloves will <br /> be discarded after collecting samples from each 18-inch <br /> sample drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.