My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
INSTALL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:45:32 AM
Creation date
1/9/2020 11:42:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1986
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAPREALIAN ENGINEERING, INC. <br /> K E Consulting Engineers <br /> 535 Main Street <br /> Martinez, Ca. 94553 <br /> (41 5) 372.5444 <br /> KAPREALIAN ENGINEERING, INC. (KEI) <br /> Standard Operating Procedure Concerning Soil <br /> Sampling During Removal of Underground Fuel Tanks <br /> When any subsurface fuel tank is removed, whether for <br /> permanent site closure or tank replacement, the following <br /> activities shall be performed. <br /> 1 . Visual inspection of excavation. All excavation <br /> surfaces shall be inspected for evidence of <br /> leakage. Evidence of leakage would include stained <br /> soil , areas of free product, etc. The results of <br /> such inspection shall be documented. <br /> 2 . Two soil samples shall be analyzed from beneath the <br /> tank, one from directly beneath the fill pipe, the <br /> other from a similar position at the opposite end <br /> of the tank. If obviously stained or contaminated <br /> areas exist in locations other than the two above <br /> locations, then additional soil samples shall be <br /> analyzed from these obviously stained or <br /> contaminated areas or as instructed by the <br /> Regulatory Agencies. <br /> 3 . Soil samples shall be collected from the native <br /> soil at a minimum of two feet below the tank <br /> bottom. Samples shall be taken using a clean <br /> driven-tube type sampler, capped and sealed, and <br /> extruded in the lab in order to reduce the loss of <br /> volatile materials . <br /> 4 . The following soil sampling method shall be used at <br /> the tank removal site. <br /> - Immediately upon removal of the tank, a backhoe <br /> bucket of native soil shall be taken from the <br /> native soil/backfill interface or a minimum of 2 <br /> feet below the tank. This soil shall be rapidly <br /> brought to the surface. <br /> - Approximately three inches shall be rapidly <br /> scraped away from the surface of this soil , then a <br /> clean brass tube (at least three inches long) shall <br /> be driven into the soil with a wooden mallet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.