Laserfiche WebLink
I <br /> F <br /> SITE SAFETY & REMEDIATION PLAN <br /> PAGE 3 <br /> D) Placer Tractor Service will arrange to have Alpha Analytical Laboratory take <br /> the required soil samples unless arrangements have been previously made by <br /> the customer. Alpha Analytical is State Certified (#1241 for Hazardous Waste <br /> samples and results are usually received within five to seven working days, <br /> unless contract requires 24 -- 48 hour results. In this case, we would advise <br /> that samples be run in 24 - 48 hours. <br />�. E) Onsite Personnel: ' <br /> 1 ) The following personnel are designated to carry out job'functionsas needed <br /> onsite. They all have been certified in Hazardous Waste, Safety Training and <br /> CPR. <br /> Albert Oesterling Rodger Thomas Cathy Thomas <br /> Lori"Thomas Bill Teal VRoger Brett ' <br /> S <br /> Gordan Skeel Mac McConnell Lynn Selzer <br /> Danny Inman Barry Queen <br /> H) Local agencies: ll <br /> San joaquin"Lbcal Health District <br /> " 1 <br /> P.O. Box 2009 <br /> k Stockton, CA. 95202 <br /> l SECTION II; RISK ANALYSIS & SAFETY AND HEALTH PLAN 1 <br />�- 1. Tasks Planned: <br /> A."'Excavation of contaminated soil <br /> B. Monitoring soil with PID meter <br /> la C. Soil Sampling <br /> D. Backfill excavation and resurface.. <br /> F. Excavation pit will be ramped so shoring is not. needed <br /> f: <br /> �CONTINUED ON PAGE 4 <br />