My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1930
>
2900 - Site Mitigation Program
>
PR0527262
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:32:21 PM
Creation date
1/9/2020 2:25:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527262
PE
2950
FACILITY_ID
FA0018463
FACILITY_NAME
SWIFT ROOFING
STREET_NUMBER
1930
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
13336033
CURRENT_STATUS
01
SITE_LOCATION
1930 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 October 2007 <br /> AGE-NC Project No. 07-1524 <br /> Page 9 of 10 <br /> measured using an electric water level indicator. Water level data will be recorded to the nearest 0.01 <br /> foot from a reference point marked of the top of the PVC well casing. Before and after each use,the <br /> electric oil/water level indicator will be washed in an Alconox solution and rinsed with water. <br /> 4.5.2. Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling, the well will be purged using <br /> a Waterra inertia pump, submersible pump or a disposable bailer, to ensure that the sample is <br /> representative of the formation,rather than water standing in the well casing.The well will be purged <br /> until: 1)a minimum of three casing volumes is removed from the well;and/or 2)the field-measured <br /> ground water parameters have stabilized. However, if a well is purged dry prior to evacuating three <br /> casing volumes, a ground water sample will be collected following 80 percent recovery of ground <br /> water within the well or within 8-hours of well evacuation. <br /> Purge water and decontamination water generated during the ground water sampling activities will <br /> be contained in DOT-approved drums which will be appropriately labeled for storage. Drums <br /> containing purge water will be stored on-site pending appropriate removal and disposal. <br /> 4.5.3. Sample Withdrawal <br /> Water samples will be collected from the monitoring well using a dedicated Waterra polyethylene <br /> tubing or disposable polyethylene bailer.The tubing,which is dedicated to each individual well and <br /> replaced periodically(usually annually)and bailers,which are disposed of after one use and require <br /> no decontaminating,thereby minimizing cross contamination due to sampling devices. Samples will <br /> be drawn and collected in such a manner that agitation and exposure of the groundwater to the <br /> atmosphere is minimal. Sample containers will be filled using the appropriate disposable sampling <br /> attachment which allows controlled flow out of the bottom of the bailer by lifting up on the check <br /> valve. <br /> 4.5.4. Sample Handling <br /> Ground water samples will be collected into laboratory supplied containers. Ground water samples <br /> to be analyzed for TPH-g, BTEX and fuel additives will be collected into 40-m1 VOA vials. <br /> Following collection, the samples will be placed on ice and kept in a cooler until delivered to the <br /> laboratory for analysis.Chain-of-custody protocols will be used to document sample custody transfer <br /> from the field to the analytical laboratory. A chain-of-custody forth will accompany the samples. <br /> Advanced GeoEnvironmentai,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.