Laserfiche WebLink
v � <br /> 31 October 2007 <br /> AGE-NC Project No. 07-1524 <br /> Page 10 of 10 <br /> 4.6. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools used for sample collection, except for disposable bailers, will be thoroughly <br /> rinsed with clean water atter being washed with a solution of Alconox. All down-hole drilling <br /> equipment will be pressure washed prior to starting each boring. <br /> Decontamination water generated during the ground water sampling activities will be contained in <br /> DOT-approved drums which will be appropriately labeled for storage. Drums containing <br /> decontamination water will be stored on-site pending appropriate removal and disposal. <br /> Advanced GeoEnvironmental,Inc. <br />