Laserfiche WebLink
01 0 <br /> Location Map E A R T HT E c M Borehole/Well No: MW-2 <br /> �) <br /> A f1JCO INTERNATIONAL LTD.COMPANY Page 2 of 2 <br /> Project Name: Tyco Electronics Fremont Street Project No.: 102790 <br /> Client: Tyco Electronics Corporation Borehole Depth: 20' <br /> Borehole Diameter. 3"/8" <br /> Driller: Gerard G.of RSI Start Date: 06/09/08 <br /> Drilling Equipment: Hand Auger/Geoprobe 6620DT combo rig Completion Date: 06/09/08 <br /> Location Description: Drilling Method: Hand auger/DPT and HSA Logged By: P.Dotson <br /> Sampling Method: Slide hammer/dual tube Checked By: B.Loebner <br /> _ U <br /> 7 Z+ d N O a <br /> C <br /> a p « Y <br /> Sample E p o a4i m m o 0 <br /> ID. i= a m o cn Lithology Remarks <br /> CLAYEY SILT:grayish brown(2.5YR 4/4);low plasticity,medium <br /> stiff,moist <br /> 16'grades to <br /> SILTY CLAY:dark yellowish brown(1 OYR 4/4);low plasticity;soft; <br /> CL moist <br /> 17.5 <br /> 17.5 <br /> 1158 4/4 18'grades to <br /> SILTY SAND:dark yellowish brown(I OYR 4/4);—50%fine sand at 18' <br /> SM to 70%fine sand at 20';30-50%non-plastic fines;loose;moist <br /> Complete boring <br /> at 1158. <br /> zo <br /> Total depth drilled-20'bgs. 20 <br /> Total depth sampled-20'bgs. <br /> 22.5 <br /> 22.5 <br /> 25 <br /> 25 <br /> 27.5 <br /> 27.5 <br /> 30 <br /> 30 <br /> L:4ork1 102 7901generalIG WU Repor112Q20081Boring <br />