My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1950
>
2900 - Site Mitigation Program
>
PR0523458
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:48:08 PM
Creation date
1/9/2020 2:35:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0523458
PE
2959
FACILITY_ID
FA0015852
FACILITY_NAME
FORMER TEC FACILITY
STREET_NUMBER
1950
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
952032041
APN
13336040
CURRENT_STATUS
01
SITE_LOCATION
1950 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 . 0 <br /> Location Map E A R T HT E c H Borehole/Well No: MW-3 <br /> A tyCO MYTERNAn0MAL LTO.COMPANY Page 1 of 2 <br /> Project Name: Tyco Electronics Fremont Street Project No.: 102790 <br /> Client: Tyco Electronics Corporation Borehole Depth: 20' <br /> Borehole Diameter: 3"/8" <br /> Driller: Gerardo G.of RSI Start Date: 06/09/08 <br /> Drilling Equipment: Hand Auger/Geoprobe 6620DT combo rig Completion Date: 06/09/08 <br /> Location Description:North side of Drilling Method: Hand auger/DPT and HSA Logged By: P.Dotson <br /> building approximately mid-building Sampling Method: Dual tube Checked By: B.Loebner <br /> v <br /> aD <br /> E Z• o. <br /> a <br /> o m <br /> a U o to <br /> Sample E p o a m am) •o o LIth010 Remarks <br /> ID. F- a m W _Jo cn o' 9Y <br /> CN 0-0.5' Concrete Begin 0845. <br /> Cut through <br /> 0.5-4.0'LEAN CLAY:very dark grayish brown(I OYR 3/2)mottled concrete. <br /> 1 with very dark gray(I OYR 3/1);some silt;medium plasticity;soft; Hand augured to <br /> 5'bgs. <br /> damp to moist Push 4'liners to <br /> collect soil <br /> CL samples for <br /> lithology. 2.5 <br /> 5/5 2.5 <br /> Ream borehole <br /> with 8"O.D. <br /> hollow-stem <br /> 4.0'grades to augers to 20' <br /> SILTY CLAY:dark yellowish brown(1 OYR 3.5/6);medium plasticity; Install 2" <br /> soft;moist diameter <br /> monitoring will. <br /> 5 <br /> 0913 3/3 <br /> 7-7.5'wet. <br /> 7.5 CL zs <br /> 1° <br /> 918 4/4 10 <br /> 11'grades to <br /> CLAYEY SILT:brown(I OYR 5/3);low plasticity;medium stiff;damp <br /> 12.5 ML 12.5 <br /> 0923 4/4 13.5' SILTY SAND:light olive brown(2.5Y 5/3);60%fine sand;40% <br /> SM low plastic fines;loose;saturated <br /> 14'grades to <br /> ML 75 <br /> 15 <br /> L.IworkU017901generalIGWM Reporr11Q20080oring Logs <br />
The URL can be used to link to this page
Your browser does not support the video tag.