My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011463
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
3500 - Local Oversight Program
>
PR0545152
>
ARCHIVED REPORTS_XR0011463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:30:16 PM
Creation date
1/9/2020 3:06:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011463
RECORD_ID
PR0545152
PE
3526
FACILITY_ID
FA0004021
FACILITY_NAME
STOCKTON CITY TAXI CAB COMPANY
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
02
SITE_LOCATION
2085 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 45 to 65 feet bgs. A sand pack was placed in the annulus of MW 11 R extending from <br /> the bottom of the well screen to approximately two feet above the well screen. Approximately three <br /> ' feet of bentonite were placed on top of the sand pack and hydrated to form an annular seal. Cement <br /> grout was tremmied on top of the bentonite and the well was completed at grade with a watertight, <br /> flush-mounted traffic rated vault. MW11R was installed approximately five feet west of MW11. The <br /> ' location of MW11R is shown on Figure 12. MW11 was destroyed and grouted to the ground surface. <br /> Well construction details for MW11R and lithological descriptions associated with destroyed <br /> monitoring well MW 11 are included in Attachment 3. <br /> 1 On April 18, 2005, MW11R was developed and sampled and the top of the casing was surveyed for <br /> elevation. MW l 1 R was developed by pumping approximately 38 gallons (approximately 17 well <br /> casing volumes). Following development of the well, a groundwater sample was collected with a <br /> disposable bailer and delivered to Argon Laboratories for analyses of the analytes previously <br /> mentioned. The groundwater well purge and sample log for MW11R is included in Attachment 1. <br /> ' 1,2-DCA was detected in the groundwater sample collected from MW11R on April 18, 2005, at a <br /> concentration of 1.1 µg& None of the other analytes were detected at or above the laboratory <br /> reported detection limits. The analytical results of the groundwater sample are summarized in Table <br /> ' 2. Laboratory data sheets and chain-of-custody documentation are contained in Attachment 2. <br /> SECOND QUARTER 2005 SAMPLING ACTIVITIES <br /> r� On June 27, 2005, groundwater samples were collected from MW through MW 10, MW11R, and <br /> MW 12. Prior to collection of groundwater samples,the depth to water was measured in the wells and <br /> ' the pH, electrical conductivity, and temperature were measured in groundwater purged from the <br /> monitoring wells and recorded. A minimum of three well casing volumes were purged from each <br /> monitoring well prior to sampling. The wells were allowed to recover and samples were collected <br /> from each well using disposable polyethylene bailers. The groundwater samples collected from each <br /> well were submitted to Argon Laboratories for analyses of the analytes previously mentioned. <br /> Groundwater well purge and sample logs are included in Attachment 1. <br /> 1 SECOND QUARTER 2005 GROUNDWATER FLOW DIRECTION <br /> Water levels were measured in monitoring wells MW through MW10, MW11R, and MW12 on June <br /> 27, 2005. Water levels in the shallow zone (MWI, MW2, MW3, MW8, MW9, MW10, and MW1IR) <br /> ranged from 47.80 to 49.56 feet below the tops of the well casing elevations. Water levels in the <br /> intermediate zone wells (MW4, MW5, MW6, and MW12) ranged from 48.86 to 49.72 feet below the <br /> tops of the well casing elevations. The water level in the deep zone well,MW7, was 49.41 feet below <br /> the top of the well casing elevation. The water level data were used to develop the groundwater <br /> ' elevation contour maps shown in Figures 13 and 14. Groundwater flow in the shallow zone was <br /> variable with eastward and northward components flowing toward the center of the site. Groundwater <br /> flow in the intermediate zone was towards the south. The average hydraulic gradient in the <br /> 1 intermediate zone on June 27, 2005, was calculated to be 0.0007 ft/ft or approximately 4 ft/mile. A <br /> summary of groundwater monitoring data is presented in Table 1. <br />' r <br /> s:lenviromental1283491reports12005 1&2 QMR,doc 4 ATC Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.