Laserfiche WebLink
Quik Stop Station No 39 February 14,2003 <br /> Stockton California Results,Report and Work Pian Addendum <br /> CONTENTS <br /> INTRODUCTION I <br /> SITE DESCRIPTION AND BACKGROUND 2 <br /> ADDITIONAL SUBSURFACE INVESTIGATION 3 <br /> RESULTS OF ADDITIONAL SUBSURFACE INVESTIGATION 5 <br /> PROPOSED MONITORING WELL INSTALLATIONS 6 <br /> DISTRIBUTION g <br /> FIGURES AND TABLES <br /> FIGURE 1 SITE VICINITY MAP <br /> FIGURE 2 SITE PLAN <br /> TABLE 1 GROUNDWATER MONITORING DATA <br /> TABLE 2 GROUNDWATER ANALYTICAL RESULTS <br /> APPENDICES <br /> • APPENDIX A SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH <br /> DEPARTMENT CORRESPONDENCE <br /> APPENDIX B HORIZON ENVIRONMENTAL INC FIELD METHODS AND <br /> PROCEDURES <br /> APPENDIX C CONE-PENETROMETER TEST LOG <br /> APPENDIX D ANALYTICAL REPORTS AND CHAIN-OF-CUSTODY DOCUMENT <br /> APPENDIX E TYPICAL MONITORING WELL CONSTRUCTION DIAGRAM <br /> C kProjects17039kl41WPaddnm2-03 doc <br /> Project No 7039 14 11 HORIZON ENVIRONMENTAL INC <br />