My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011527
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
3500 - Local Oversight Program
>
PR0545154
>
ARCHIVED REPORTS_XR0011527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:48:41 PM
Creation date
1/9/2020 3:37:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011527
RECORD_ID
PR0545154
PE
3528
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
02
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quik Stop Station No 39 February 14, 2003 <br /> Stockton California Results Report and Work Plan Addendum <br /> representative samples of the drill cuttings stockpile for characterization and <br /> disposal purposes <br /> Construct monitoring wells with 2-)Inch inside diameter (ID), flush-threaded, <br /> Schedule 40, polyvinyl chloride (PVC) casing and 2-inch ID, PVC, 0 020-inch <br /> slotted well screen set at 40 to 60 feet bsg Install #3 sand filter pack adjacent <br /> to and extending approximately 2 feet above the screened intervals Install <br /> bentonite chip on top of the sand to seal the filter packs Neat cement sanitary <br /> seals shall be set in the remaining annulus above the bentonite The flush- <br /> mounted well heads shall be fitted with locking caps and the surface shall be <br /> completed with flush-mounted traffic-rated vault boxes A typical monitoring <br /> well construction diagram is contained Appendix E <br /> Submit selected soil samples from the new monitoring well borings and <br /> submit, under COC documentation to Kiff for analysis of TPHg, BTEX, the <br /> seven fuel oxygenates, DCA and DBA by EPA Method 8260B Additionally <br /> analyze the stockpile soil sample for total lead by EPA Method 6010 <br /> Task 3 Develop and sample the new monitoring wells according to Horizon Field <br /> Methods and Procedures Survey the top-of-casing elevation of the new <br /> monitoring wells to GeoTracker specifications <br /> Submit groundwater samples, under COC documentation, to Kiff for analysis <br /> of TPHg, BTEX, the seven fuel oxygenates, DCA and DBA by EPA Method <br /> 8260B <br /> Task 4 Prepare a report which documents installation of the additional monitoring <br /> wells and analytical results of soil and groundwater sampling Evaluate the <br /> analytical results for delineation of lateral and vertical extent of petroleum <br /> hydrocarbons in groundwater <br /> C Trojects%703%141WPaddnm2-03 doc <br /> Project No 7039 14 7 HORIZON ENVIRONMENTAL INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.