My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5400
>
2800 - Aboveground Petroleum Storage Program
>
PR0545140
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:02 PM
Creation date
1/10/2020 9:28:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545140
PE
2832
FACILITY_ID
FA0025200
FACILITY_NAME
CECCHINI TRUCKING CO INC, CTC CFC
STREET_NUMBER
5400
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05516072
CURRENT_STATUS
01
SITE_LOCATION
5400 W HWY 12
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cecchini Trucking Company Inc. <br />SPCC Plan <br />April 2020 <br />Page 27 of 63 <br />Any spillage will be cleaned up immediately. For larger spills Cecchini Trucking <br />will contact the spill contractor to cleanup and remove the spilled material. <br />There is no secondary containment for this container, however the facility will <br />consider obtaining a spill pallet for future use which will hold the entire contents of <br />the tank if a puncture occurs. <br />Bulk Oil Storage Area in Maintenance Shop <br />Table 5 — Bulk Oil Storage in Maintenance Shop <br />4.2 Other Oil Containers <br />Truck Yard — 55 -gallon drums are stored in the truck yard area in various locations. Each <br />drum is properly labeled. All drums have their own individual spill pallets which are large <br />enough to hold the entire contents of the drum and are covered with a tarp to prevent <br />rainwater from filling the secondary containment space. All 55 -gallon drums are inspected <br />according to STI SP001 Inspection Checklist (Monthly & Annual); refer to Appendix C in this <br />Plan. The STI Inspection Forms are kept at the facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.