My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_1987 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:25:20 PM
Creation date
1/10/2020 12:00:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2005
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROCEDURES FOR TRANSFER OF PRODUCT FROM ABOVE GROUND <br /> TANKS 7 & 9 AT 3505 NAVY DRIVE, TO UNDERGROUND STORAGE TANK. <br /> 1. Gauge underground tank prior to transferring from above ground tank <br /> and record reading in logbook located in warehouse. <br /> 2. Verify that check valve on containment well fill- pipe, is closed prior <br /> to opening main tank drain valve. <br /> 3. Open main drain valve on above ground tank. <br /> 4. Open check valve on fill pipe to control flow to containment well. <br /> 5. Fill Containment well only to half-way mark ( 11 inches) using gauge <br /> stick to measure, and shut off flow at check valve. <br /> 6. Open valve inside of containment well, to transfer product to <br /> underground tank. <br /> 7. Repeat this process until water is removed by visual verification. <br /> 8. When all water is removed, close main tank drain valve on <br /> aboveground tank and open check valve on fill pipe to purge contents <br /> of fill- pipe into containment well. <br /> 9. Make sure all product is transferred out of containment well, to <br /> underground tank prior to terminating operation. Cover well with <br /> metal cover. <br /> 10.Record number of transfers and estimated gallons of product in log <br /> book. <br /> 11.Re-gauge underground tank and record in logbook. <br />
The URL can be used to link to this page
Your browser does not support the video tag.