My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL/15/2009/WED 12;25 PM NuWtar Energy STKN FAX No, 2099430653 P. 002/006 <br /> 07/15/2DD9 10:58 FAX 209 744 0118 I> 0005/0006 <br /> ® Check this box it no tank gauging or SIR egUlpment is htistalled. <br /> This section mutt be completed it in-tank gauging equrpment is used to perforin leak detertlon rronfto tg. <br /> Completothr following checklist: <br /> ❑ Yas ❑ No" Has all Input wiring been Inspected for ptopar entry and termination,including testing for ground faults? <br /> ❑ yes ❑ No• Were all tank gauging probes visually InspWed for damage and residue buildup? <br /> ❑ Yes [3 No* Was accuracy of system product level readings tesleo? <br /> ❑ Yes 0 No' Was accuracy of system water level readings tasted? <br /> ❑ Yes ❑ Na' Were all probes reinstalled Properly? <br /> Q Yes Q Nd' We a ail items on the equipment manufact irefs maintenance ohecklist eempleted? <br /> In Section H,below,describe how and when these defluiandea were or will be corrected_ <br /> A10 Leak Detectors(LLA): 0 Check this box if LLD$are not Instated. <br /> Com lata the followintlChecklist <br /> ❑ YO 0 No' For equipment start-up or annual equipment carpbcation,was a leek simulated to verity LLD performana7 (Check a/j that apply) <br /> ❑ WA Simulated leak rate: ❑3 g.p,h., ❑0.1 g.p.h: ❑0.2 g.p.h. <br /> 0 Yes ❑ No• Were at[LLDs conAmted operational and accurate within regulatory requirements? <br /> LL Yes ❑ No' Was ft tasting apparatus property cafbratad? <br /> Q Yee © No' For mm;hanical LLD$,does the LLD restrict product flow if it detects a.leak? <br /> ❑ WA <br /> ❑ Yes ❑ No' Forelectronic LLDs,does the turbine automatically shut off ifthe LLD detects a leak? <br /> 0 NIA <br /> ❑ Yes ❑ No' For alectronio LLDs,does the turbine automatically shit off y any portion of the monitonng system is disabled or disconnected? <br /> ❑ WA <br /> ❑ Yes ❑ No' For electronic LL"dans the turbine automatically shut offif any portion of tha rfmctoring system malfunctions or fail®a test? <br /> ❑ NIA <br /> © Yea ❑ No" For elactronio LLDs,We all acomible wiring connections been visually impacted? <br /> ❑ NIA <br /> ❑ Yes 0 No' Were all Itama on the equipment manufacturer's malntermnoe checklist completed? <br /> In Section H,below,describe how and when those defioloneias were or will be Corrected• <br /> H. Comments: <br /> Monitoring 8ystcm CerVicatlon Page 3 of 4 2121107 <br /> Monitoring System CerHftcatlon <br />
The URL can be used to link to this page
Your browser does not support the video tag.