My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page > of-:7- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ,Piping Manufacturer El Industry Standard El Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ),t,ssure E3 Vacuum F-1 Hydrostatic <br /> El Other(Specify) 1 <br /> Test Equipment Used: Cf r-55 tk,--e 6-, - P QVx I Equipment Resolution: S <br /> Piping Run# 5 Piping Run# 2--0 Piping Run# Fliping Run# <br /> t <br /> Piping Material: ► 61v!�/44( 5 % <br /> Piping Manufacturer: v,4 ` <br /> vuvk AtAA.(VdV� <br /> Piping Diameter: <br /> Length of Piping Run: AP7)-vdV - 301 Av,))e <br /> Product Stored: W a'5 t<- �e Y- PJ44-c V)q4-ev, <br /> Method and location of C I <br /> piping-run isolation: 112S j�w-� -,4- Y. <br /> Wait time between applying <br /> ressure acuurn1water and <br /> startmg test: <br /> Test Start Time: I L) <br /> Initial Reading(RI), -.t. <br /> Test End Time: 1) 7- 1 <br /> Final Reading(RF)- 57.P <br /> S-7- 5 �e5 <br /> Test Duration: fr ol,4111 <br /> Change in Reading(RF-Ri): -t.- <br /> - -, <br /> Pass/Fail Threshold or <br /> Criteria: N L11)5 S fl, pit) 1,-s6 I-VI <br /> Test Result: Pass 0 Fail Pass 0 Fail 0 Pass 0 Fail 0 Pass <br /> ,�4 <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.