Laserfiche WebLink
SWRCB,January 2002 Page > of-:7- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ,Piping Manufacturer El Industry Standard El Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ),t,ssure E3 Vacuum F-1 Hydrostatic <br /> El Other(Specify) 1 <br /> Test Equipment Used: Cf r-55 tk,--e 6-, - P QVx I Equipment Resolution: S <br /> Piping Run# 5 Piping Run# 2--0 Piping Run# Fliping Run# <br /> t <br /> Piping Material: ► 61v!�/44( 5 % <br /> Piping Manufacturer: v,4 ` <br /> vuvk AtAA.(VdV� <br /> Piping Diameter: <br /> Length of Piping Run: AP7)-vdV - 301 Av,))e <br /> Product Stored: W a'5 t<- �e Y- PJ44-c V)q4-ev, <br /> Method and location of C I <br /> piping-run isolation: 112S j�w-� -,4- Y. <br /> Wait time between applying <br /> ressure acuurn1water and <br /> startmg test: <br /> Test Start Time: I L) <br /> Initial Reading(RI), -.t. <br /> Test End Time: 1) 7- 1 <br /> Final Reading(RF)- 57.P <br /> S-7- 5 �e5 <br /> Test Duration: fr ol,4111 <br /> Change in Reading(RF-Ri): -t.- <br /> - -, <br /> Pass/Fail Threshold or <br /> Criteria: N L11)5 S fl, pit) 1,-s6 I-VI <br /> Test Result: Pass 0 Fail Pass 0 Fail 0 Pass 0 Fail 0 Pass <br /> ,�4 <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />