Laserfiche WebLink
S WRCB,January 2002 Page ff of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard %Arofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ._ _._ _ _ __❑ . sure __ - -. <br />_. ... .._-... Pis _ ._...�._❑Vacuum._...__._..---.-- Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Ca 1,,� � , c�i t-a�V Equipment Resolution: , a Q Z g <br /> Sump# Sump# ump# Sump# <br /> Sump Diameter: 4f 2_(i <br /> Sump Depth: 24 /I <br /> Sump Material: 1'c 6.4,-21 C,S <br /> Height from Tank Top to Top of ( Z-% <br /> { <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest N p .P t e e..4-y J a,1 <br /> Electrical Penetration: �ye Jl,,4 w <br /> Condition of sump prior to testing: to r <br /> Portion of Sump Tested' W ct.t,,.y C.,„ k j XA v <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No '�1A ❑Yes ❑No NA ❑Yes No ❑NA ❑Yes N ❑NA <br /> product and water)?0 0 <br /> Turbine shutdown response time N) k- <br /> Is system programmed for fail-safe ❑Yes ❑No OA ❑Yes ❑NA ❑Yes ❑ ❑NA ❑Yes ❑NAshutdown? <br /> 0 <br /> Was fail-safe verified to be ❑Yes ❑No ❑Yes ❑ ❑NA ❑Yes ❑ ❑NA ❑Yes JN11NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/ er d starting <br /> test: 10 r-a r,A+-Y- <br /> Test <br /> 1--cTest Start Time: [ u v <br /> Initial Reading(RI): r rvy� Lry�� <br /> Test End Time: 3 v <br /> Final Reading(RF): C i- (p <br /> Test Duration: 1 tAw1k 1 Y g <br /> Change in Reading(RF-RI): No <br /> Pass/Fail Threshold or Criteria: o 6S 136 Y-/ <br /> Test Result: J<Pass ❑Fail ❑ P ss ❑Fai ❑ Pass ❑ it ❑ Pass ❑Fa <br /> Was sensor removed for testing? 92es ❑No ❑NA ❑Y ❑No ❑N Yes ❑No A Yes ❑No ❑ <br /> Was sensor properly replaced and es ❑No ❑NA ❑ es ❑No ❑N ❑Yes ❑No ❑ A JOYes ❑No ❑N <br /> verified functional after testing?. <br /> s S <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />