My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.SWRCB,January 2002 Page 7 of a <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Fest Method Developed By: ❑Spill Btac.cet Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Meth—oded: 11Pressure ❑Vacuum 11 Hydrostatic,,-- <br /> ❑Other(Spec) <br /> Test Equipment Used: ``�.. Equipment Res urion: <br /> IN ,, t 3 ;011111112, :,ra" Spill�o" Spill Box# pill Box# Spill Box# <br /> Bucket Diameter: -, <br /> Bucket Depth: <br /> Wait time between applying �w <br /> pressure/vacuum/water and <br /> starting test: �. <br /> Test Start Time: 'e <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): �•., <br /> Test Duration: <br /> Change in Read (RF-Rj): <br /> Pass/Failshold or <br /> h <br /> Criteria;.'' <br /> Tei exult: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comm nts—(i ude information on repairs made prior to test in , and recommended ollow-u for ailed tests) x <br /> { !/�✓ d 1L 47 a 14 u <br />
The URL can be used to link to this page
Your browser does not support the video tag.