My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. SWRCB,January 2002 Page_ of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> FFill <br /> y is Not Equipped With Fill Riser Containment Sumps <br /> ser Containment Sumps are Present, but were Not Tested [l <br /> ethod Developed By:------t.1 Su�Manufacturer— ❑ Industry Standard— -M Professional Engineer0 Other(.Sped) <br /> etho sed: 1-1 Pressure U Vacuum ❑ Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Equipment Resolq . <br /> Fill Sump# Fill Sump# Fill Sump# Fill Sump# <br /> Sump Diameter: <br /> Sump Depth <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rr): <br /> Test End Time: <br /> Final Reading(RF): , <br /> Test Duration: <br /> Change in Reading(RF- <br /> Pass/Fail Threshold o riteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail Pass ❑Fail <br /> Is there a senso n the sump? 0 Yes 0 No 0 Yes. 0 No 0 Yes 0 No Lixes 0 No <br /> Does the sen r alarm when <br /> either pro ct or water is ❑Yes ❑No ❑NA 0 Yes ❑No ❑NA 0 Yes ❑No ❑NA ❑Yes ❑ ❑NA <br /> detecte . <br /> Was nsor removed for testing? ❑Yes ❑No 0 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes C7 No NA <br /> Was'sensor properly replaced and 0 Yes 0 No F NA []Yes 0 No ❑NA ❑Yes 0 No ❑NA ❑Yes ❑No ❑NA <br /> verified firnctional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.