My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑ Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: X Pressure ❑Vacuum n Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run# 1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter. 5" <br /> Length of Piping Run: 200' <br /> Product Stored: Water <br /> Method and location of Test boot Test boot Test boot Test boot <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:05 <br /> Initial Reading(RO: 5 PSI <br /> Test End Time: 9:35 <br /> Final Reading(RF): 5 PSI <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R4): 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: z Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests) <br /> Retest on South Line <br />
The URL can be used to link to this page
Your browser does not support the video tag.